Sign in

MacLondon

@maclondon.bsky.social
179 followers 20 following 1.6K posts
PostsRepliesMedia
MacLondon @maclondon.bsky.social · 02/10/2026
Photos of the revised Colebrooke Row modal filter. @raynoldchow.bsky.social @edmondchuihw.bsky.social
030
MacLondon @maclondon.bsky.social · 20/09/2026
Some nighttime photos around Newham. Starting with Water Lane (and its parallel crossing) which got resurfaced this week. @raynoldchow.bsky.social @edmondchuihw.bsky.social @safecycleldn.bsky.social
190
MacLondon @maclondon.bsky.social · 20/09/2026
Pics of the works at the north + east sides of Cavendish Square (not far from Oxford Circus) where the underground car park has permanently closed. The east side of the square is still open (and should eventually get it's one-way direction reversed.)
050
MacLondon @maclondon.bsky.social · 19/09/2026
Farthingale Walk has finally reopened. No convenient dropped kerb at the west end of it though (pic 2). Legacy cycle route is usable again (red line in pic 3), but it connects to a one-way section of C2. @newhamcyclists.uk @edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
140
MacLondon @maclondon.bsky.social · 16/09/2026
Current status with the Sigdon Rd modal filter (pic 1). Wall has now been demolished behind the relocated bus stop on Dalston Lane, below the railway Bridge (pic 2). Resurfacing outside Hackney Town Hall should be finished later tonight.
260
MacLondon @maclondon.bsky.social · 15/09/2026
Some of the new road markings for cyclists around the Leyton Rd/Chobham Rd junction following some recent resurfacing. The C16 realignment has still to be signed.
140
Reposted by MacLondon
Newham Cyclists @newhamcyclists.uk · 14/09/2026
Very exciting news: A trial section of the future Stratford High Street bus priority scheme is now under construction, for the eastbound section of High Street from Bow Roundabout to Marshgate Lane. Aside from a new bus lane, this will introduce a number of improvements for cycling.
Screenshot of One.network showing a roadworks possession on Stratford High Street E15 from 8 September 08:00 to 23 October 23:59, permit no. HS61832607095-02.

Description
Kerbing and paving works, bus island construction, cycle lane construction, resurfacing, lining, signs and temporary island removal
Location
High Street Stratford, Marshgate Lane to City West Tower
1101
MacLondon @maclondon.bsky.social · 10/09/2026
At QEOP, new "C" signs are up possibly intending to connect Hackney Wick Station to Stratford Station (Montfichet Rd entrance), with a spur to East Bank (that might extend to C22). Pool St is currently being resurfaced. @newhamcyclists.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
280
MacLondon @maclondon.bsky.social · 10/09/2026
Contraflow cycling has now been removed from the very end bit of Clipstone St. (For now, there is still a contraflow lane marked towards Clipstone Mews.)
Two 'Except cycles' plates that have been removed It will eventually be possible for cyclist to turn right here to head southbound down Cleveland StNew 'no left turn' from Cleveland St into Clipstone St
142
Reposted by MacLondon
Newham Cyclists @newhamcyclists.uk · 09/09/2026
Good news, finally, on the Newham #Greenway diversion: preliminary designs are going to Cabinet, with the hope of getting spades in the ground this financial year. The designs are excellent for an interim scheme. Let’s hope we see some speedy movement on this soon. mgov.newham.gov.uk/ieIssueDetai...
0156
MacLondon @maclondon.bsky.social · 07/09/2026
'C' signs are up at Streatham Hill for the almost completed (but unopened) section of the major route towards Brixton (CFR15). A couple of the southbound signs (at crossing points) need to be swapped. @raynoldchow.bsky.social @edmondchuihw.bsky.social @safecycleldn.bsky.social
2111
MacLondon @maclondon.bsky.social · 07/09/2026
Surprised to see C7 road markings along the new route between Clapham Common and Wandsworth Common. The Cycleway signs have an unnumbered 'C'. @raynoldchow.bsky.social @edmondchuihw.bsky.social @safecycleldn.bsky.social
670
MacLondon @maclondon.bsky.social · 02/09/2026
At Pembury Circus, the final section of resurfacing has been completed on Pembury Rd. The southbound cycle track + its left turn for cyclists has now opened. Northbound cycle track is yet to open. @hackneycycling.org.uk @safecycleldn.bsky.social @raynoldchow.bsky.social @edmondchuihw.bsky.social
580
MacLondon @maclondon.bsky.social · 31/08/2026
Tower Hamlets have finally permitted cyclists to legally pass through the long-standing filter on Cephas Avenue. @raynoldchow.bsky.social @edmondchuihw.bsky.social
Previous 'emergency only' filter
092
MacLondon @maclondon.bsky.social · 31/08/2026
A look around the recently installed toucan crossing on Sterling Way in Enfield. Provides a 🚲 link between Silver Street station and College Close.
120
MacLondon @maclondon.bsky.social · 30/08/2026
New cycle track on Pettman Crescent (Plumstead) should be finished in the next week or so. This will be an improvement on the legacy route (via the spiral ramp) and will link TfL's planned Thamesmead scheme to where C4 will eventually reach. @safecycleldn.bsky.social @raynoldchow.bsky.social
252
MacLondon @maclondon.bsky.social · 28/08/2026
Works under way around the modal filter at Colebrooke Row (along Cycleway 27). @raynoldchow.bsky.social @edmondchuihw.bsky.social @cycleislington.uk
4133
MacLondon @maclondon.bsky.social · 27/08/2026
Some photos around the ongoing Pembury Circus + completed Dalston Lane resurfacing. Pics 4-5 are where the future parallel crossing will go in, to the west of Hackney Downs station. Dalston Lane is scheduled to reopen on Monday.
260
MacLondon @maclondon.bsky.social · 22/08/2026
Some pics at the east side of Tidal Basin Roundabout. Newest construction here is for a cycle track at the SE corner of the roundabout (pics 3-4) where the pavement used to be shared used. @newhamcyclists.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
Continuing works at the NE corner of the roundabout New works at the SE corner of the roundabout looking towards the future separated cycle + pedestrian crossings
170
MacLondon @maclondon.bsky.social · 19/08/2026
The final section of resurfacing at St Paul's gyratory appears to have been completed early. The planned two-way on Montague St seems to be currently in operation (pics 3-5).
090
MacLondon @maclondon.bsky.social · 19/08/2026
Contraflow cycling recently added to Summers St. @camdencyclists.bsky.social
050
MacLondon @maclondon.bsky.social · 19/08/2026
Resurfacing begins tonight around Pembury Circus for 8 nights. Pics 2-3 will be the new northbound cycle track north of the junction. Pics 4-5 are the 2 (now closed) ends of Sigdon Rd + Spurstowe Terrace where a new parallel crossing will go in. @hackneycycling.org.uk
021
MacLondon @maclondon.bsky.social · 15/08/2026
In Hackney... Paragon Rd's underused contraflow cycle track has been unnecessarily 'blocked' for the past week! Arrow point to where the footway is closed at the back of the cinema.
010
MacLondon @maclondon.bsky.social · 15/08/2026
This weekend's road closure on Clerkenwell Rd is for crane works.
020
MacLondon @maclondon.bsky.social · 14/08/2026
Permanent🚦have gone up for the new Pool St crossings. Pic 4 is now where Pool St has a road closure. The previous full road closure is now a single lane closure. @newhamcyclists.uk
150
MacLondon @maclondon.bsky.social · 14/08/2026
Current status with the (eastern) Jupp ramp near Stratford Station. This side of the exiting footbridge is being redone as part of the Hawthorne House project. Building itself has recently been completed. @newhamcyclists.uk @edmondchuihw.bsky.social @raynoldchow.bsky.social
140
MacLondon @maclondon.bsky.social · 11/08/2026
Current road closure on Hoxton Street, including the Santander Cycles docking station.
030
MacLondon @maclondon.bsky.social · 11/08/2026
How the C55 realignment between Park Lane and South Carriage Drive is shaping up. Seems that there will also be a wand-protected pedestrian route through the former 🚗 exit gate. @edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
2110
MacLondon @maclondon.bsky.social · 09/08/2026
Some Cycleway 4 scheme pics at Charlton, where the permanent pedestrian crossings are open on 3 sides of the junction. E side has none yet. The crossings on the W + S sides are temporarily shared_use (pics 3-5). Pic 6 is how westbound cyclists are directed toward the start of C4.
172
MacLondon @maclondon.bsky.social · 09/08/2026
One error at the edge of the ongoing St Paul's gyratory resurfacing works. Bollard has been reinstated facing in the wrong direction (pics 1-2). @edmondchuihw.bsky.social
When it was correctly positioned
030
MacLondon @maclondon.bsky.social · 07/08/2026
In among some new wayfinding for C18 (between Deptford Bridge and Catford)... a first C64 sign is up for northbound cyclists to get to Greenwich via the ramp at Elverson Road DLR. @safecycleldn.bsky.social @edmondchuihw.bsky.social @raynoldchow.bsky.social
250
MacLondon @maclondon.bsky.social · 07/08/2026
On Clerkenwell Rd, some new westbound cycle tracks (pics 1-4). The reworked Gray's Inn Rd + Rosebery Ave junctions could be operational on Aug 17. @raynoldchow.bsky.social @edmondchuihw.bsky.social
192
MacLondon @maclondon.bsky.social · 07/08/2026
Along C10... how the signed (but illegal) right turn into Montague Place got dealt with. @edmondchuihw.bsky.social @raynoldchow.bsky.social
Current statusPrevious status
040
MacLondon @maclondon.bsky.social · 06/08/2026
C63 markings have gone in between Maple St and Howland St - S'bound only, still unopened. Phase 14 (Foley St to Howland St) area is still giving priority to adjacent construction sites. Pic 6 are new road markings at east end of Riding House St. @camdencyclists.bsky.social @maxsullivan.bsky.social
030
MacLondon @maclondon.bsky.social · 29/07/2026
New seating arrangement on the Hackney Wick side of the A12 footbridge 🚲🚶 that Cycleway 16 should eventually pass over.
Where seat was relocated from
020
MacLondon @maclondon.bsky.social · 27/07/2026
Hackney have been repainting many of their 🚲 markings of late, especially along C27. They've finally added a number to the De Beauvoir "C" marking below... but it should be C1 for this right_turn, not C27. @hackneycycling.org.uk
450
MacLondon @maclondon.bsky.social · 26/07/2026
Junction 3 of the Romford Rd scheme has just some areas of cycle path surfacing to be finished off (at red boxes on map). The 2 toucan crossings at the W + E of the junction are operational, even though most cycle tracks aren't yet open. @newhamcyclists.uk @raynoldchow.bsky.social
240
MacLondon @maclondon.bsky.social · 24/07/2026
Shared use area outside Liverpool St's Elizabeth Line entrance is now far less cramped. The bollard disc is back on public view at the west end of the pedestrian street (pic 4). @citylcc.bsky.social @safecycleldn.bsky.social @raynoldchow.bsky.social @edmondchuihw.bsky.social
2101
MacLondon @maclondon.bsky.social · 24/07/2026
I think these might be fairly new signs on Cowcross St leading to St John St. It basically converts the slip road onto Charterhouse St into a cycleway. @marcus-on-a-bike.bsky.social @edmondchuihw.bsky.social @raynoldchow.bsky.social
370
MacLondon @maclondon.bsky.social · 24/07/2026
Current status at Woodberry Grove/Seven Sisters Rd junction. TfL are doing junction safety works (red box on map). Housing development (blue box) has made a section of Woodberry Grove one-way.
120
MacLondon @maclondon.bsky.social · 24/07/2026
One side of Maury Rd has gone a bit continental. 🔀 @edmondchuihw.bsky.social @hackneycycling.org.uk
150
MacLondon @maclondon.bsky.social · 21/07/2026
Pics along Phase 1 of the planned Thames Water works/road closure along Highbury Grove.
120
MacLondon @maclondon.bsky.social · 21/07/2026
New parallel crossing for the C-route that passes under St James Street station in Waltham Forest. @raynoldchow.bsky.social @edmondchuihw.bsky.social
040
Reposted by MacLondon
Fraser @fraser-hay.bsky.social · 18/07/2026
Update following phase 1. Lay-by just being used for storage. Painted southbound cycle lane in; can see (based on road markings at traffic lights) where northbound contraflow will go. Bus stop island very near completion with a very wide crossing point for pedestrians. Phase 2 next week.
141
MacLondon @maclondon.bsky.social · 18/07/2026
Pavement widening and an incoming zebra crossing at the junction of Paddington St (C27) and Chiltern St. @maxsullivan.bsky.social
071
MacLondon @maclondon.bsky.social · 18/07/2026
Photos along Goods Way. The 2🚦crossings for Granary Sq are both fully open, with the toucan crossing now leading directly to King's Boulevard... although shortly after cyclists still have signs to dismount. Pic 4: an entry to the Google building. @edmondchuihw.bsky.social @raynoldchow.bsky.social
New pelican crossingToucan crossing now leads
181
MacLondon @maclondon.bsky.social · 14/07/2026
At the Hackney Town Hall scheme, Wilton Way has reopened with its modal filter (pic 4) reinstated.
100
MacLondon @maclondon.bsky.social · 13/07/2026
The cycle track on Tidal Basin Rd is now undergoing its revision and extension for two-way use. @newhamcyclists.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
181
MacLondon @maclondon.bsky.social · 13/07/2026
Newly opened extension of the two-way cycle track on Carpenters Rd. It's currently open as far as the crossing in pic 3 which can be used to get onto the Pool St shared pavement. Pic 4 is further SE along Carpenters Rd where the shared pavement has had surface treatment. @newhamcyclists.uk
240
MacLondon @maclondon.bsky.social · 13/07/2026
Some new @cycleislington.uk Cycleway signs have gone up around Newington Green. Red box = extension of C23 Black box = C20 (a separate section is open in Enfield) There's also a C-route on Leconfield Rd. @raynoldchow.bsky.social @edmondchuihw.bsky.social @safecycleldn.bsky.social
343