MacLondon @maclondon.bsky.social · 14h
The main works area around Hackney Town Hall is now at Wilton Way.
Bollards have been removed from the modal filter. Motorists can only drive westbound here (i.e. towards the camera).
000
MacLondon @maclondon.bsky.social · 14h
The fire gate further along the road has been reinstated. Pic 2 shows the nearby railway arches that are being upgraded.
100
MacLondon @maclondon.bsky.social · 14h
Reading Lane did reopen this week 🚲 🚗 .
100
MacLondon @maclondon.bsky.social · 13/10/2026
This indicates that it's TfL (not LBHF) that will do the work here. Previously mentioned start date of approx Feb '27 is possibly dependent on the workforce being finished with the main works for the C4 extension to Woolwich on time... which does look likely.
000
MacLondon @maclondon.bsky.social · 13/10/2026
Misleading headline, thanks to the staggered borough boundary on the road at the E end: "Kensington High St to get protected cycle track" The date on the drawings could be 17th Feb (unusual)... but definitely not from 2017, as this was well before the Cycleways rebrand. Pic 3 = C9 + C34 markings.
Dashed line is the borough boundaryDrawings for future C9, showing C34 markings where it will turn northbound onto Bute Gardens and southbound from Wolverton Gardens
100
MacLondon @maclondon.bsky.social · 09/10/2026
Beside Hackney Town Hall, the reworking of Reading Lane looks nearly complete now. (It is still closed at the Mare St junction.) @hackneycycling.org.uk @edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
130
MacLondon @maclondon.bsky.social · 08/10/2026
I think these are new signs added along the Narrow Way (Mare St). @hackneycycling.org.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
030
MacLondon @maclondon.bsky.social · 08/10/2026
One cycle track is yet to open at Pembury Circus. They look close to completing the pavement work + rain garden where a temporary crossing had been in use
031
MacLondon @maclondon.bsky.social · 08/10/2026
Both modal filters are now fully surfaced. The parallel crossing might be close to being fully open.
020
MacLondon @maclondon.bsky.social · 08/10/2026
Looks like the routes in pics 1 + 2 could be used as southbound diversions, apart from when Clement's Lane get closed for the resurfacing in late Jan.
020
Reposted by MacLondon
City of London Cycling Campaign @citylcc.bsky.social · 08/10/2026
Oh joy! 🙄 King William St southbound contra flow cycle lane to be removed from Saturday 24 Oct due to next stage of footway works starting. Until the final road resurfacing takes place in late Jan 2027, there will be a southbound diversion in place via Cornhill and Gracechurch St..
Construction works at 10 King William St with scaffolding at street level and new concrete core and red crane above.  The northbound traffic lane is closed for works access.
112
MacLondon @maclondon.bsky.social · 06/10/2026
Some new tactiles have gone in along Dalston Lane - for🚶to cross the unfinished modal filters at Sigdon Rd + Spurstowe Terrace.
140
MacLondon @maclondon.bsky.social · 06/10/2026
Permanent🚦are now operational at Pembury Circus. A few of the pedestrian crossings have moved from their temporary alignments. They were still removing some of the temporary traffic management when I was passing. @raynoldchow.bsky.social @edmondchuihw.bsky.social
New pedestrian crossing
270
Reposted by MacLondon
Newham Cyclists @newhamcyclists.uk · 05/10/2026
The Council has posted a page with its plans for the #Greenway diversion via Plaistow Road, along with a timetable: starting the southern section early next year, finishing by Autumn. We support this scheme & want it to be accelerated wherever possible. newhamco-create.co.uk/en/projects/...
Diagram showing a redesign of Plaistow Road in Newham, with a 2-way cycleway on the north side. The footways and cycleways are continuous with Dutch entry kerbs over the junctions of Church Street, Stephens Road, and Plaistow Grove. A new straight-across parallel zebra and cycle crossing just east of Stephens Road makes it possible to cross Plaistow Road. The junction mouth of Church Street is narrowed significantly. A traffic island in the centre of the road is removed. On the north side, the cycleway runs behind a bus stop, with the boarding island reachable by a zebra crossing.
2154
MacLondon @maclondon.bsky.social · 04/10/2026
Recent junction improvements at Donegal St/Rodney St. Part of a new School Street and also of a long promised cycle route that was shown on the Central London Grid (pic 3). @safecycleldn.bsky.social @raynoldchow.bsky.social @edmondchuihw.bsky.social
170
MacLondon @maclondon.bsky.social · 02/10/2026
Photos of the revised Colebrooke Row modal filter. @raynoldchow.bsky.social @edmondchuihw.bsky.social
050
MacLondon @maclondon.bsky.social · 26/09/2026
Pavement work at Colebrooke Row looks close to completion.
010
MacLondon @maclondon.bsky.social · 26/09/2026
The Spurstowe Terrace cycle track has now been carved out.
020
MacLondon @maclondon.bsky.social · 26/09/2026
The cyclists dismount notices did eventually get removed from King's Boulevard.
030
MacLondon @maclondon.bsky.social · 26/09/2026
Hackney's errant road marking on the shared section of C27/C1 has been corrected. It now has a (new) "C27" with a straight_ahead arrow. @liamduffy.dev
010
MacLondon @maclondon.bsky.social · 24/09/2026
Yep. They've already started digging at the periphery of the park for the future 'moats'. reefandpartners.com/projects/cav...
000
MacLondon @maclondon.bsky.social · 23/09/2026
The Sigdon Rd modal filter now looks a lot more like the drawings (pic 1). The Spurstowe Rd modal filter (pic 2) is still waiting to have its cycle track shaped.
030
MacLondon @maclondon.bsky.social · 20/09/2026
Revised crossings at Tidal Basin Roundabout. Cycle route along Lower Lea Crossing to the cycle shuttle bus is basically along its final alignment now, apart from at the unfinished parallel crossing on Seagull Lane. ?? 1-2 weeks from being complete on N side of Western Gateway. @newhamcyclists.uk
070
MacLondon @maclondon.bsky.social · 20/09/2026
Future C16 crossing across Chobham Rd. If you stop at the white line (ahead of the🚦), there's no bike signal on the far side of the crossing 🙈, so instead you have to place trust on the🚶crossing signal (pic 3, circled). @newhamcyclists.uk
180
MacLondon @maclondon.bsky.social · 20/09/2026
Cycle crossing on Pool St is now marked, but🚦still to be activated.
130
MacLondon @maclondon.bsky.social · 20/09/2026
Blue cycle crossing on Carpenters Rd.
130
MacLondon @maclondon.bsky.social · 20/09/2026
Some nighttime photos around Newham. Starting with Water Lane (and its parallel crossing) which got resurfaced this week. @raynoldchow.bsky.social @edmondchuihw.bsky.social @safecycleldn.bsky.social
1100
MacLondon @maclondon.bsky.social · 20/09/2026
Pics of the works at the north + east sides of Cavendish Square (not far from Oxford Circus) where the underground car park has permanently closed. The east side of the square is still open (and should eventually get it's one-way direction reversed.)
060
MacLondon @maclondon.bsky.social · 19/09/2026
Upgrade works at the dropped kerb on Anthems Way around the corner from the Olympic Park Ave parallel crossing. @newhamcyclists.uk
120
MacLondon @maclondon.bsky.social · 19/09/2026
Works at Colebrooke Row have now moved to the north side of the pavement.
110
MacLondon @maclondon.bsky.social · 19/09/2026
'C25' has since been added to the empty shield.
010
MacLondon @maclondon.bsky.social · 19/09/2026
I think an additional pedestrian crossing at the black line would be welcome here, possibly even a toucan crossing so westbound C2 cyclists could get across to the Farthingale Walk route. Red line is the convoluted route for🚶along High St. Many🚶join the 🚲 crossing instead just to simplify things.
130
MacLondon @maclondon.bsky.social · 19/09/2026
Farthingale Walk has finally reopened. No convenient dropped kerb at the west end of it though (pic 2). Legacy cycle route is usable again (red line in pic 3), but it connects to a one-way section of C2. @newhamcyclists.uk @edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
150
MacLondon @maclondon.bsky.social · 18/09/2026
Final night of resurfacing on Water Lane. @newhamcyclists.uk
000
MacLondon @maclondon.bsky.social · 16/09/2026
Current status with the Sigdon Rd modal filter (pic 1). Wall has now been demolished behind the relocated bus stop on Dalston Lane, below the railway Bridge (pic 2). Resurfacing outside Hackney Town Hall should be finished later tonight.
270
MacLondon @maclondon.bsky.social · 15/09/2026
End date signed for the works around the Alma St road closure has been extended to 25 Sep.
010
MacLondon @maclondon.bsky.social · 15/09/2026
Some of the new road markings for cyclists around the Leyton Rd/Chobham Rd junction following some recent resurfacing. The C16 realignment has still to be signed.
150
MacLondon @maclondon.bsky.social · 15/09/2026
A couple of new signs along C25 near Marshgate Lane.
020
MacLondon @maclondon.bsky.social · 15/09/2026
There's another future branching C-link to Stratford International at the parallel crossing to Anthems Way (with no more signs further along.) Pics 4-5 are at the C16 end of the Olympic Park Ave C-route.
230
MacLondon @maclondon.bsky.social · 15/09/2026
The C-link to C16 via Olympic Park Ave has one dodgy sign at the C25 end (pic 1). @marcus-on-a-bike.bsky.social
220
MacLondon @maclondon.bsky.social · 15/09/2026
Signs for a (future) C-route to Stratford International. DLR roundle on the sign suggests how the route will go via International Way, but there doesn't seem to be any further signs along the route.
Sign is less will lit in one direction and slightly obscured by branches
110
MacLondon @maclondon.bsky.social · 15/09/2026
Some more of the new Cycleway signs around Stratford City/Westfield. Some inconsistency with the times + destinations, such as on the same pole (pics 1-3) on Montfichet Rd at the cycle crossing. This crossing seems to (currently) be the end of C25.
110
Reposted by MacLondon
Newham Cyclists @newhamcyclists.uk · 14/09/2026
Very exciting news: A trial section of the future Stratford High Street bus priority scheme is now under construction, for the eastbound section of High Street from Bow Roundabout to Marshgate Lane. Aside from a new bus lane, this will introduce a number of improvements for cycling.
Screenshot of One.network showing a roadworks possession on Stratford High Street E15 from 8 September 08:00 to 23 October 23:59, permit no. HS61832607095-02.

Description
Kerbing and paving works, bus island construction, cycle lane construction, resurfacing, lining, signs and temporary island removal
Location
High Street Stratford, Marshgate Lane to City West Tower
1111
MacLondon @maclondon.bsky.social · 14/09/2026
Thames Water works on Highbury Grove. www.islingtontribune.co.uk/article/four...
islingtontribune.co.uk
Four months of closures on the roads
Water works set to cause major disruption
111
MacLondon @maclondon.bsky.social · 10/09/2026
The (C-route) cycle track along Tidal Basin Rd has been widened to become two-way. Is usable from the nearby City Hall exit road, despite not yet getting its top surface.
040
MacLondon @maclondon.bsky.social · 10/09/2026
The ViewTube ramp from the Newham Greenway looks close to completion. @safecycleldn.bsky.social
150
MacLondon @maclondon.bsky.social · 10/09/2026
Signs along Carpenters Rd before the route fades away as it gets to White Post Lane. I get the impression that Clarnico Lane will be a link to C25.
130
MacLondon @maclondon.bsky.social · 10/09/2026
At QEOP, new "C" signs are up possibly intending to connect Hackney Wick Station to Stratford Station (Montfichet Rd entrance), with a spur to East Bank (that might extend to C22). Pool St is currently being resurfaced. @newhamcyclists.uk @raynoldchow.bsky.social @edmondchuihw.bsky.social
280
MacLondon @maclondon.bsky.social · 10/09/2026
The clearly wrong (and dangerous) 'Except cycles' is still in place on Clipstone St on the west side of Gt Titchfield St.
000
MacLondon @maclondon.bsky.social · 10/09/2026
There's still been no start to the C63 works between Foley St and Howland St. The🚦for future contraflow cycles has been installed at the southern end of Cleveland St.
110