Reposted by Samantha Allen

Another very productive weekend on my Canadian clients layout in the books! All the track got laid and switch back constructed on the coal mine plateau, the ONR shops finally got assembled and the roundhouse is now permanently placed and all twelve tracks installed and wired!
Videos below ⬇️