Sign in

jointtransit.bsky.social

@jointtransit.bsky.social
100 followers 22 following 178 posts
PostsRepliesMedia
Reposted by @jointtransit.bsky.social
Shabazz Stuart @shabazzstuart.bsky.social · 01/10/2026
How about: "City with severe housing crisis overwhelmingly voted to fast-track new homes – and now it’s finally happening."
1536
Reposted by @jointtransit.bsky.social
Ben S @bensh3.bsky.social · 24/08/2026
The BQE reaction is a good look into just how much uncritical Mamdani fawning there actually is, even down to thinking that invoking The Power Broker makes this an anti-Robert Moses action.
5739
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 19/08/2026
If the MTA learns more about these techniques now, it could help subway expansions down the line, Lorenzo said.

“This could be a good time to consider bringing in some international consultants to help train local contractors and help give them the expertise in doing this,” she said. “The problem is not just that this project ends up costing so much more than it should cost. It’s, what does that mean for the next project and the project after that? You need to start to learn how to do things better and to do things at a reasonable price if New York is going to build the subway system it needs in the future.”
092
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 19/08/2026
A 125 St subway should be a slam dunk. But at $7.7B for 1.25 miles, and with stations deep underground, current plans would not only build the most expensive subway in the the world, but would cost riders valuable minutes every single trip. It's not too late, however: www.etany.org/reports/digg...
etany.org
Digging Out of a Very Deep Hole: Saving Billions on 125th Street — Effective Transit Alliance New York
A 125 St subway should be a slam dunk. But at $7.7B and with stations more than 100 ft underground, it would be the most expensive subway in the world, and cost riders more than 5 minutes every trip b...
27025
jointtransit.bsky.social @jointtransit.bsky.social · 13/08/2026
They should close down one half (or maybe all) of State St between Lake/Wacker, pedestrianize it, and then install elevators and stairs for an in system transfer between the elevated State/Lake and the underground State/Lake stations.
120
Reposted by @jointtransit.bsky.social
Streetsblog NYC @nyc.streetsblog.org · 20/07/2026
The city would accelerate street safety projects by “at least 33 percent” if voters pass a ballot proposal in November pushed by Mayor Mamdani’s Commission on Government Efficiency, which officials shared exclusively with Streetsblog.
buff.ly
Mamdani's Charter Panel Wants to Speed Up Bike and Bus Lane Projects by 33% - Streetsblog New York City
The mayor's Commission on Government Efficiency says its ballot proposal will streamline street safety projects.
17414
Reposted by @jointtransit.bsky.social
Jason Rabinowitz @airlineflyer.net · 05/07/2026
A $3 @mta.info subway fare and some good Q train timing can buy you one hell of a view of the July 4th fireworks and the Brooklyn Bridge light show! Huge shoutout to the train operator for slow rolling over the Manhattan Bridge and the conductor for announcing it.
265207463773
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 26/06/2026
The @queenslink.org project would turn an abandoned rail line into a busy subway line. Unfortunately, the project is at risk due to a competing project which would block its path. The best plan for New York’s future is QueensLink. Read on our website: www.etany.org/statements/t...
QueensLink is a proposal to open a new subway line connecting Rego Park, Forest Park, Howard Beach, and the Rockaways. Much like the Interborough Express, the project would reactivate an intact, mostly abandoned rail line to provide service to underserved neighborhoods. In the case of QueensLink, this is the former LIRR Rockaway Beach Branch, which was abandoned in 1955 except for its southern part, which was reactivated to bring the A train to the Rockaways in 1956. Put simply, QueensLink would turn currently abandoned tracks into a busy subway line serving tens of thousands of riders a day.
Unfortunately, the proposal is at risk due to a competing proposal called QueensWay. QueenWay seeks to convert the same right-of-way into a linear park with no transit service. QueensLink, in contrast, would include both transit and green space along the majority of the route, wherever there is room, including the same location as QueenLink. Regrettably, on June 30th the New York City Council is set to vote on an Adopted Budget which includes $50 million of city funding to construct the first phase of the QueensWay park, the Metro Hub, directly blocking QueensLink’s path.

(read the rest at etany.org)According to estimates from The Transit Costs Project’s A Better Billion proposal, QueensLink would cost $2.8 billion in 2025 prices, and see ridership of 105,000 people every weekday. The high ridership is a combination of all of the following travel markets:
New service from currently unserved areas of Rego Park, Forest Park, and Woodhaven
Trips parallel to Woodhaven Boulevard, which corridor has 30,000 weekday bus riders
New trips between Manhattan and JFK, currently served by the slower A train
Leisure trips between Manhattan or Central Queens and the beaches in the Rockaways
Trips from the Rockaways, Howard Beach, and Ozone Park to Manhattan or Long Island City, currently served by the A via Lower Manhattan
Additional trips from the Queens Boulevard Line to Brooklyn, since the diversion of M trains from Forest Hills allows bringing back the G to the Queens Boulevard local tracks

(read the rest at etany.org)In short, by building on an existing right-of-way, QueensLink can serve a huge number of riders for a comparatively affordable cost. If QueensWay is built, however, it will sever this part of the corridor, either meaning the park would have to be demolished in the future (a difficult proposition) or a long and expensive subway would need to be built under Woodhaven Boulevard.
The Rockaway Beach Branch is a unique opportunity for New York: a publicly owned right-of-way in a dense urban corridor with high property value. Corridors like that do not grow on trees, and any city would be foolish not to take advantage. The best plan for New York’s future is QueensLink.

(read the rest at etany.org)
15318
jointtransit.bsky.social @jointtransit.bsky.social · 12/06/2026
I wouldn't be surprised. Pro-Queensway comments are downvoted into oblivion on that reddit, so to see 55 upvotes on that pro-QW garbage comment would raise serious alarm bells.
030
Reposted by @jointtransit.bsky.social
QueensLink @queenslink.org · 12/06/2026
Did you missed the hearing yesterday? You still have 48 hours to submit a written testimony at the 🔗 in bio! Reminder that deadline will be on Saturday June 13, 2026 at 10:00pm!
182
jointtransit.bsky.social @jointtransit.bsky.social · 07/06/2026
I know that having 4 car trains has its uses, but why the Blue Line? That section between Logan Sq and Clark/Lake is one of the most crowded sections on the L network and should not be 4 cars.
010
Reposted by @jointtransit.bsky.social
Blair Lorenzo / The Fox and the City @thefoxandthecity.com · 06/06/2026
I have to admit, I'm shocked this passed the legislature after last year. It is the equivalent of requiring elevator operators. It's a policy that exists nowhere else in the world.
4578
Reposted by @jointtransit.bsky.social
David Powe @davidpowe.bsky.social · 06/06/2026
CDOT lost the best of our team yesterday. We're heartbroken. In memory of Riley O'Neil, please refer to these bike racks as "Riley Racks". He led Chicago's bike parking program for several years. Our hearts are broken, but we want to make sure his legacy lives on 💙🚲 Please spread the word
Standard U rackStandard U rackStandard U rack
41878276
Reposted by @jointtransit.bsky.social
Award-Winning Reporter Dave Colon @davecolon.bsky.social · 05/06/2026
Cool thing alert: New York is letting the MTA do environmental review just for the tunnel for 125th Street Q train extension, instead of doing SEQRA for the entire project at the same time, saving the MTA at least $175 million if the crosstown train gets built nyc.streetsblog.org/2026/06/05/h...
nyc.streetsblog.org
Hochul Budget Deal Gives $175M Speed Boost To 125th St. Subway Expansion - Streetsblog New York City
A one-off legislative tweak will let the MTA keep its tunnel boring machine underground between subway expansion phases.
18316
Reposted by @jointtransit.bsky.social
GB Metz @notthegiraffe.bsky.social · 03/06/2026
Write the mayor. Call the mayor. He's trying to hide behind "communities need park access," but the first phase has some of the better park access in the city. And he's being vague about what constitutes "not ruling out rail" that echoes the way the Queensway ppl have done in bad faith.
0144
Reposted by @jointtransit.bsky.social
Andrew Lynch | vanshnookenraggen @vanshnookenraggen.com · 02/06/2026
Keep up the pressure. @queenslink.org
1193
jointtransit.bsky.social @jointtransit.bsky.social · 01/06/2026
>it would be $6 Billion dollars That was derived using inflated soft costs that has no precedent, even for MTA standards. If QL was calculated using just Second Ave Subway Phase 1 levels, which itself is problematic, it would be around $3.7 billion.
030
jointtransit.bsky.social @jointtransit.bsky.social · 30/05/2026
Complete L take
030
Reposted by @jointtransit.bsky.social
Andrew Lynch | vanshnookenraggen @vanshnookenraggen.com · 29/05/2026
NYC Parks, Queensway, & TfPL don't want a train here. The plan from day 1 was to use the entire ROW for park space and intentionally design the Queensway in a way that would require demolishing the entire park to add trains later. Anyone claiming this won't preclude transit is lying or an idiot.
25818
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 29/05/2026
This is the wrong decision for transit in New York. Existing rights-of-way that travel through dense, under-served neighborhoods do not grow on trees, and it's a massive own goal for any city to not take advantage of them. No plan does this better than @queenslink.org.
06824
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
Work around him, which means - Get the City Council on board (which QL is also doing) - Try to present in front of Hochul and the MTA (and using whatever contacts inside the CC to make it happen) - Get some actual believers of QL into Congress (personal opinion: Valdez for NY-7 and Park for NY-6)
030
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
Yes. Because it has no provisions for rail, and the MTA confirmed that if QL was to be a reality, that park needs to be demolished. That is not going to go well, just look at what happened with the Elizabeth St Garden.
030
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
I also believe QL is more interested in the MTA, given the MTA is starting work on another 20 Years Needs Assessment. While the MTA outright sandbagged QL in 2023, Janno didn't foreclose on the idea either. So we will see. Idk where you got QL is an unserious org from, but that is not true.
040
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
Your original claim was QL is unserious and has no local support. I gave counter examples: that are doing tabling in Queens and they have the support of almost all of the local politicians. I don't think QL is interested in Zohran anymore. They are more interested in the City Council and Hochul.
010
Reposted by @jointtransit.bsky.social
Streetsblog NYC @nyc.streetsblog.org · 29/05/2026
Mayor Mamdani is going full speed ahead with plans to build the QueensWay park over abandoned train tracks in Central Queens, after his administration decisively told advocates for bringing transit to the right of way that he won’t change course.
buff.ly
Mamdani Officially Buries The QueensLink - Streetsblog New York City
The Mamdani administration told QueensLink advocates they won't change course on plans to fund the QueensWay.
45920
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
L take. The Met Hub is located adjacent to Forest Park, one of the largest parks in the city, and will block trains on the RBB from ever materializing. And how is the RBB "hazardous" again?
0110
jointtransit.bsky.social @jointtransit.bsky.social · 29/05/2026
What are you talking about? QueensLink tables in Queens all the time and has gotten the support of dozens of local politicians. They are currently reaching out to all of the local community boards to reaffirm the support.
140
Reposted by @jointtransit.bsky.social
QueensLink @queenslink.org · 27/05/2026
Here we are again. We thought @mayor.nyc.gov @zohrankmamdani.bsky.social would be different. But unfortunately on the issue of Queens' Next Subway, he isn't budging. Fortunately, it's not over yet. City Council is holding their FINAL public hearing on the budget on JUNE 10th @ 9:30am @ City Hall.
13614
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 04/05/2026
NY's Penn Station is clogged by trains. Thankfully, there's a solution that does not involve costly reconstruction: through-running. In a newly public report, ETA illustrates how the region can use Metro-North Penn Access to build a truly regional rail network. www.etany.org/reports/thro...
etany.org
Through-Running: First Connections — Effective Transit Alliance New York
A phased plan for through-running service at Penn Station using Metro-North's Penn Station Access as a launching pad. Prepared in 2025.
03713
Reposted by @jointtransit.bsky.social
QueensLink @queenslink.org · 21/04/2026
There's always money for "one more lane" but never enough for the train 🤦🏻‍♀️ (cue the "Curb Your Enthusiasm" music) Tell Mayor Mamdani to #BuildtheQueensLink by visiting the 🔗 in bio and writing a letter!
1225
jointtransit.bsky.social @jointtransit.bsky.social · 13/04/2026
Go send some letters via here: thequeenslink.org/get-involved... If you sent them, send them again to your representatives. Flood their inboxes. That is how they will notice. Keep it civil, of course.
thequeenslink.org
Save Transit Now | Contact Your Leaders – QueensLink
010
jointtransit.bsky.social @jointtransit.bsky.social · 13/04/2026
NIMBYs are extremely close in ensuring that crucial rail corridor will never be used for rail. Not unless we tell City Hall no way with Queensway and that we want @queenslink.org. www.youtube.com/watch?v=_JpG...
youtube.com
NYC is Making a Mistake and Queens is Going to Pay For It
YouTube video by Joint Transit Association
130
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 02/04/2026
ETA and other civic orgs are urging NY not to require two operators on every train. One-person train operation (OPTO) is a standard practice used on every subway system around the world—including on the MTA. This bill would hurt riders and lock NY's transit system in the past. tinyurl.com/etatpto
Dear Speaker Heastie, Majority Leader Stewart-Cousins and Chairs Cooney, Comrie, and 
Braunstein:   
We urge you to oppose S9586 (Parker) and A10706 (Chandler-Waterman), that would restrict 
the MTA’s use of one-person train operation (OTPO), the industry standard for subway systems 
in the U.S. and internationally. Under your leadership, the Legislature has done an outstanding 
job supporting the MTA through new dedicated tax revenues. We thank you for this and hope 
you continue focusing on big picture questions like the MTA’s financial sustainability as it faces 
out-year budget gaps and federal funding challenges.  
The bills require each New York City Transit subway train to have at least two crew members: a 
conductor, and operator. This is not required for any other U.S. transit system, except for the 
Port Authority Trans-Hudson (PATH), or the world’s other major transit systems. This legislation 
would prevent the MTA from adopting the industry standard and realizing operational 
efficiencies as it deploys new trains designed to work with the billions of dollars of advanced 
signal technology being installed throughout the subway system.  
A 2025 report by NYU’s Marron Institute of Urban Management’s Transit Costs Project, “How 
Many People Does it Take to Operate a Train?” found that less than 6% of 400 rail lines around 
the world use two or more train operators. Of the 94% that use one or fewer operators, many 
are completely automated and more are working  towards automation as modern signal 
systems are installed. These systems have operated safely without conductors, or any staff in 
some cases, on board. The MTA has also safely and successfully operated one-person subway 
trains since 1996 on shuttles and at off-peak hours. We supported Governor Hochul’s veto of S4091/A4873 in 2025 because leaving operational 
strategies and decisions to management is the best, most flexible path to high-quality service at 
the lowest cost. The MTA should be able to follow facts and implement national and 
international best practices for staffing and technology investments. Good management and 
good transit service are based on facts, not special interest politics.  
Mandating specific staffing levels by law also risks squandering the billions in capital 
investments to modernize subway signals that are being spent by the MTA and NY State 
government, including $5.4 billion in the 2025-29 capital program, and $5.0 billion in the 
2020-24 program. It will also make it harder for the MTA to improve service—the key to building 
higher ridership. We look to you as proven champions of better transit to focus your efforts on 
forward-looking investments, not policies micromanaging subway staffing and operations. 
Thank you,  
John Kaehny 
Executive Director 
Reinvent Albany 
Andrew Rein 
President  
Citizens Budget Commission 
Blair Lorenzo 
Executive Director 
Effective Transit Alliance 
Eric Goldwyn 
Professor and Program Director 
NYU Marron Transit Costs Project 
Steven Fulop 
President and CEO 
Partnership for New York City 
Tom Wright 
President and CEO 
Regional Plan Association 
Cc:  
Governor Kathy Hochul 
Janno Lieber, Chair and CEO of the Metropolitan Transportation Authority
15112
jointtransit.bsky.social @jointtransit.bsky.social · 31/03/2026
Once again, pleasure working with you all! Let's get a better design for 125th! Updates will come soon.
020
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 31/03/2026
A 125th St Q extension is the right route, but with a price of > $7B/mi and deep stations forcing 5+min escalator trips, the current plan doesn't work. ETA sat down with @jointtransit.bsky.social to talk fixes for this vital link. Watch!: www.youtube.com/watch?v=5Fgy...
youtube.com
Did NYC's Newest Subway Just Get Better?
YouTube video by Joint Transit Association
3327
jointtransit.bsky.social @jointtransit.bsky.social · 30/03/2026
Agreed. But just a question, would Woodhaven Blvd still be converted into an express station under QL?
150
Reposted by @jointtransit.bsky.social
Transportation Alternatives @transalt.org · 27/03/2026
"The scaremongers were wrong. Over its first 14 months, the congestion pricing system has exceeded even the high hopes of many supporters. It has reduced traffic, improved the quality of life and even provided a boost for businesses. Talk of killing it has faded."
27428
Reposted by @jointtransit.bsky.social
QueensLink @queenslink.org · 25/03/2026
South Queens is in a full blown Transportation Crisis. @mayor.nyc.gov’s preliminary budget has kept $43 million in funding for the anti-transit scheme QueensWay. As designed, QueensWay would prevent a future north-south subway in Queens from ever being built.
1308
jointtransit.bsky.social @jointtransit.bsky.social · 25/03/2026
Please cut Queensway, @mayor.nyc.gov. It is more than just a waste of money, it is paying money to ensure that we can never use a crucial rail corridor as a rail corridor.
0132
Reposted by @jointtransit.bsky.social
QueensLink @queenslink.org · 25/03/2026
In a groundbreaking new report, transportation professionals from the Steer Group have found QueensLink would generate billions in economic growth, time savings, and quality of life improvements for New Yorkers!
1146
Reposted by @jointtransit.bsky.social
Andrew Lynch | vanshnookenraggen @vanshnookenraggen.com · 22/03/2026
Looks like Mayor Mamdani is proposing to keep funding the Queensway's Metro Hub. As designed, this will block future reactivation of the LIRR Rockaway Branch. This goes against his previous support. So if other parks need $43 million, I know where they can get it.
A line item from Mayor Mamdani's proposed city budget showing $43 million dollars set aside for the Queensway's Metro Hub park.
75111
jointtransit.bsky.social @jointtransit.bsky.social · 22/03/2026
In NYC -Build in house facilities -CBTC -SAS -IBX -Utica -Queenslink -SE Queens Line -LGA Extension -NE Queens Lines -Fordham Rd ALM -Bergenline ALM -Hillside Extension -Penn Station Through Running -Penn/GCT Tunnel -Atlantic/Hoboken Tunnel -Electrify PJ, Montauk, Hoboken Div, Raritan, Hudson
140
Reposted by @jointtransit.bsky.social
Blair Lorenzo / The Fox and the City @thefoxandthecity.com · 18/03/2026
I wasted part of my day on this...
Big dog / little dog meme:
Top: Train size, Big dog as commuter rail, little dog as IRT
Bottom: Ridership, big dog as IRT, little dog as commuter rail
1223
Reposted by @jointtransit.bsky.social
Effective Transit Alliance @etany.org · 09/03/2026
Last week, NJ Gov Sherrill announced that the NJ Turnpike would replace the Newark Bay Bridge with only one span, finally ending a wrongheaded highway expansion. Urban highway widenings have no place in the 21st century, & ETA joins our partners in applauding this decision. tinyurl.com/3757cdhs
"Blair Lorenzo, Executive Director, Effective Transit Alliance
"This is a great decision by Gov. Sherrill, one which should have always been a no-brainer. Urban highway widenings have no place in the 21st century, and all too often, the need for structural replacement is used as an excuse for hidden road expansion. This is the right call not only for New Jersey, but for the entire metropolitan area."
"
0228
Reposted by @jointtransit.bsky.social
Hannah Who @notablyuncool.bsky.social · 03/03/2026
Every trans person who refuses to shrink their identity to fit the room is expanding the world for everyone else.
7782197
Reposted by @jointtransit.bsky.social
unregistered goosecam 2 @goose.cam · 26/02/2026
mr president, you look strong and powerful and important every time you do exactly what zohran mamdani suggests. all of the cool and popular people are saying this
143029
Reposted by @jointtransit.bsky.social
JRUrbaneNetwork @jrurbanenetwork.bsky.social · 25/02/2026
I was told elevated rail ruins neighbourhoods.
2479
Reposted by @jointtransit.bsky.social
Sam @samd.bsky.social · 24/02/2026
eternal glory to the people’s republic of mamdanistan
Rudy Giuliani Republican
8 years of allowing NIMBY member deference
Mike Bloomberg
"Republican"
12 years of allowing NIMBY member deference
"Bill de Blasio"
Democrat
8 years of allowing NIMBY member deference
Eric Adams
"Democrat"
4 years of allowing NIMBY member deference
Zohran Mamdani
DEMOCRATIC SOCIALIST
Stopped member deference in 2 MONTHS
1134247
jointtransit.bsky.social @jointtransit.bsky.social · 20/02/2026
BASED?
150
Reposted by @jointtransit.bsky.social
Alejandra Caraballo @esqueer.net · 18/02/2026
In a blatant violation of NY state and NYC law, NYU Langone has shut down its youth gender clinic and caused a potential forced detransition to its patients. Where is the NY AG and Mayor Mamdani? www.nytimes.com/2026/02/17/n...
nytimes.com
Manhattan Hospital Ends Medical Treatment for Transgender Youth
16856264