Sign in

Patrick

@obike.ca
283 followers 113 following 473 posts

I run a map website of Ottawa's future cycling infrastructure: Obike.ca

PostsRepliesMedia
Patrick @obike.ca · 04/09/2026
000
Patrick @obike.ca · 04/09/2026
100
Patrick @obike.ca · 04/09/2026
The PoW and Preston intersection is almost complete. Unfortunately noticing a trend of the no right on red sign being ignored with often multiple light runners in a single cycle. Maybe needs a nearside signal on that corner. @jleiper.bsky.social @arieltroster.com @shawnmenard.bsky.social
582
Patrick @obike.ca · 16/06/2026
Can't look around at other benches to check for damage though 😆
010
Patrick @obike.ca · 16/06/2026
Hmm what interesting timing!
220
Patrick @obike.ca · 16/06/2026
There's a certain dramatic irony that we have circled back around to patio stone
020
Patrick @obike.ca · 14/06/2026
I thought removing some asphalt on my driveway to expand my patio would be a quick job... 80 years of asphalt layers!
380
Patrick @obike.ca · 09/06/2026
They added some flex posts, but haven't touched the corner they made unsafe. Will they be adding more concrete protection to the south east corner to replace the one they removed? @shawnmenard.bsky.social #ottbike
192
Patrick @obike.ca · 06/06/2026
Since the straight cyclist movement and right car movement are separate I would actually like to see some modifications to the design that would better fit this pattern. With them being exclusive movements you don't need the zig zag for visibility. And you could potentially get that higher radius.
Drawn on diagram of changes to the configuration of the intersection
260
Patrick @obike.ca · 05/06/2026
#ottbike @shawnmenard.bsky.social Can you explain the choice to remove the protected part of this protected intersection? You have created a huge sideswipe risk for anyone cycling here taking a right turn from Main.
5279
Patrick @obike.ca · 05/06/2026
While I'm not certain it would fit cause it looks tight, it does appear that they included truck aprons in the drop off loop so it might be just the driver ignoring it
Aerial imagery of Westboro beach loading zone
120
Patrick @obike.ca · 02/06/2026
Another day another car crash
122
Patrick @obike.ca · 01/06/2026
Speaking of, did you see the incredible new timber bridge Smith Falls just finished!
140
Patrick @obike.ca · 26/05/2026
The cycleway along Preston st is being paved in it's new permanent location! #ottbike
1180
Patrick @obike.ca · 16/05/2026
After:
110
Patrick @obike.ca · 16/05/2026
Picture taken seconds before I crashed my drone for the first time in 5 years 🫣
050
Patrick @obike.ca · 30/03/2026
Arboretum pathway about 1/3 melted, hopefully increasing today
321
Patrick @obike.ca · 25/03/2026
Good Morning Ottawa
4193
Patrick @obike.ca · 16/03/2026
The party at Gladstone has grown
101
Patrick @obike.ca · 04/03/2026
@gander22h.bsky.social Conefest at Preston and Gladstone! This one is a real party 🥳
291
Patrick @obike.ca · 08/02/2026
I am in total agreement with pedestrianizing the Byward, lets just be careful not to gate keep events away, this was a great event with a ton of turn out. Hope this or similar cool events can become a regular thing for Winterlude.
120
Patrick @obike.ca · 08/02/2026
Funnily, if he had posted a current picture it would be an awesome shot of the car parking temporarily closed to make way for a sick snow mobile ramp and crash pad.
120
Patrick @obike.ca · 20/01/2026
5 likes, they have identified themselves
060
Patrick @obike.ca · 24/12/2025
Just hoping that what ever ends up there ends up restoring the north side facade, pretty sure it's still there just covered up Some pics of windows covered in the stair well:
Covered from the outside window in a stairwellCovered from the outside window in a stairwell
120
Patrick @obike.ca · 12/12/2025
Hi @shawnmenard.bsky.social Wasn't the phasing of the project done to avoid closing the field during construction? I know you didn't support the project, but if we were gonna close the field for construction anyways we could have put the arena under the field! hope we still have some teams left...
1110
Patrick @obike.ca · 19/10/2025
@octranspo.com @somersetward.bsky.social We have lifted the bench at Pimisi plaza back up onto it's plinth that has been knocked over since winter, you can cancel work order #41656448
2163
Patrick @obike.ca · 28/09/2025
Anyone lose a bike? Trillium path at Bayview
010
Patrick @obike.ca · 12/09/2025
I've had this as a long term goal for a while, trying to make it far easier to access information on projects. In the future I will be adding consultation information, along with a calendar of upcoming city consultations. For now I am focused on bike projects, will soon add all traffic calming
Image showing a project page on my website, shows a preview image of the new Gladstone and Booth protected intersection, project description and a sidebar with roads featured
240
Patrick @obike.ca · 31/08/2025
There's a smaller version in Barrhaven now
110
Patrick @obike.ca · 18/08/2025
No link but here's an image of the plan at POW / Preston. Minimal changes happening at Carling until the transit project goes ahead
120
Patrick @obike.ca · 14/08/2025
Corner of Columbine and Frederick. Just follow the giant silver monolith 😆
110
Patrick @obike.ca · 14/08/2025
New park alert! The roof top park on top of the new heating plant at Tunneys Pasture has opened
1153
Patrick @obike.ca · 11/08/2025
020
Patrick @obike.ca · 02/08/2025
I'd like to see a little more housing, then the rest park like this:
230
Patrick @obike.ca · 30/07/2025
@octranspo.com @gordonfoodservice.bsky.social @ottawabylaw.bsky.social A Gordon Food Services truck was parked on top of an LRT air vent this morning. I spoke with the driver who refused to move and didnt seem to understand the potential dangers. I informed nearby special constables, who drove away
011
Patrick @obike.ca · 30/07/2025
You can also use some websites that will transfer your old tweets to bluesky, I think the one I used cost 2$, but I'm pretty sure you can do it manually somehow as well. Bluesky gives all the old ones an archived tag
000
Patrick @obike.ca · 14/07/2025
Here's the city map, def Wellington until Vimy Pl before becoming Kichi Zibi Mikan
100
Patrick @obike.ca · 28/06/2025
Confirmed, blue dotted line is the July 1 detour. Also heads up that CWC bridge will be closed June 30th 8pm to end of day July 1
110
Patrick @obike.ca · 25/06/2025
Anyone mentioned Richmond and Winston? *Note DQ now a Tim's
000
Patrick @obike.ca · 16/06/2025
OC is aware of this one now at Pimisi, wondering how long it will be until it's fixed, to add insult to injury, it's likely an RTM vehicle that destroyed it
010
Patrick @obike.ca · 28/05/2025
I prefer this installation at Pimisi
150
Patrick @obike.ca · 19/05/2025
Something I noticed while visiting the Boston area last year is how prevalent granite(?) curbs were. I suspect because they are more durable than standard concrete. Would be nice to use them so they stand up more against our snow plows. (also a benefit is them just looking absolutely awesome)
Picture of a granite curb in a parking lot near a Boston subway station
231
Patrick @obike.ca · 03/05/2025
Sure free service weekend is nice. But I don't really care about the 4$ when I just miss the train and end up waiting 10 mins. It's time to bring back the promised service levels
1263
Patrick @obike.ca · 13/04/2025
Np, visit while you can, definitely not supposed to be open yet lol
120
Patrick @obike.ca · 13/04/2025
Heads up #ottbike Kiweki Point (formerly Nepean Point) is unofficially open today. It is wonderful, a bit hot in the sun until the trees grow in. But some nice shade under the "space ship"
3152
Patrick @obike.ca · 18/02/2025
Dont normally post pictures of random people, but I had to share this one. We really should be ashamed that an older person with a walker has to walk in the road of a street like Preston. @jleiper.bsky.social @arieltroster.bsky.social I think its time we fund the updated snow clearing standards
130
Patrick @obike.ca · 12/12/2024
Probably a temporary facility while the construction is ongoing. The hospital work will include uni directional cycle tracks on POW in sections. Where does this new facility start?
120
Patrick @obike.ca · 16/11/2024
A controversial one, Earl Grey Underpass, has received some improvements, now getting a protected intersection at Didsbury rd in addition to the one at Terry Fox, and now also getting AT facilities in the underpass itself.
101
Patrick @obike.ca · 16/11/2024
A new contraflow bike lane will be built on James st from Bronson to Bank st. This project will begin construction in the spring.
110
Patrick @obike.ca · 16/11/2024
After nearly a decade of logistic related delays, the design of Carling cycle track / median bus lane upgrade project will get updated to prepare for construction. This project will add cycle tracks from Sherwood to Bronson and will connect to the Preston tracks to the south.
372