Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 16/10/2026
Please see the link below for information about road closures affecting bikeways on sections of Bloor Street, Bay Street, Bayview Avenue and Eastern Avenue on October 18 for the TCS Toronto Waterfront Marathon & Half Marathon. x.com/cityoftoronto/status/21110999…
x.com
City of Toronto 🇨🇦 (@cityoftoronto) on X
#TrafficAlert Road closures and ramp restrictions will be in effect across the downtown core and waterfront Oct. 16 to 18 for the Toronto Waterfront Marathon. Closures will affect several major roads, including sections of Bay St., Yonge St., Lake Shore Blvd., Bloor St., Bathurst St., Front St., K…
000 0
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 13/10/2026
A bike box and traffic signal have been installed at the Hopedale Avenue and O’Connor Drive intersection, which allows people cycling eastbound on O’Connor Drive to connect safely to Hopedale Avenue. Learn more about nearby road safety improvements at toronto.ca/leasidedanforthcycling.
Intersection featuring traffic and bicycle signal heads, with bicycle markings and pedestrian crosswalk.
082 8
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 09/10/2026
Beginning next week, temporary traffic signals and line markings will be added to accommodate bi-directional cyclist travel on the west side of University Avenue between Armoury Street and College Street. Please visit toronto.ca/universityqueenspark for updates.
toronto.ca
University Avenue & Queen’s Park Upgrades
Watermain replacement and road resurfacing on the east side of University Avenue from College Street to Armoury Street will begin in mid-September 2026 and is expected to be complete in Spring 2027. More details are available in the updated Construction Impact Notice. Sections of University Avenue and Queens Park Crescent East are scheduled for watermain […]
050 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 02/10/2026
Update: Bi-directional signage has been removed. The bi-directional setup will not open until all necessary safety infrastructure, including dedicated signalization and pavement markings, is fully installed by late October. Visit toronto.ca/universityqueenspark for more details.
toronto.ca
University Avenue & Queen’s Park Upgrades
Watermain replacement and road resurfacing on the east side of University Avenue from College Street to Armoury Street will begin in mid-September 2026 and is expected to be complete in Spring 2027. M...
050 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 02/10/2026
The cycle tracks on Bloor Street West under the West Toronto Railpath will be temporarily closed during repair work to the pedestrian bridge until December. Signs will direct people cycling and driving to share the lane, single file, through the work zone. ow.ly/Ujxq50ZTGMv
101 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 01/10/2026
The cycle track on the east side of University Avenue from College Street to Armoury Street is closed during construction until Spring 2027. The west side cycle track has been converted to two-way to accommodate cycling in both directions. toronto.ca/universityqueenspark #BikeTO
A person cycles in a wide cycle track on University Avenue. Signage on the sidewalk beside the cycle track indicates that it is designated for two-way travel. A wide cycle track on University Avenue features bicycle and diamond symbols. A sign located in the boulevard between the cycle track and roadway indicates that the lane is for two-way travel.
3151 15
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 15/09/2026
Phase 1 of watermain replacement and road resurfacing on the east side of University Avenue will begin in mid-September 2026. During construction, the west side cycle track will be converted to two-way to allow cycling in both directions. Learn more at toronto.ca/universityqueenspark.
toronto.ca
University Avenue & Queen’s Park Upgrades
Watermain replacement and road resurfacing on the east side of University Avenue from College Street to Armoury Street will begin in mid-September 2026 and is expected to be complete in Spring 2027. More details are available in the Construction Notice. Sections of University Avenue and Queens Park Crescent East are scheduled for watermain replacement and […]
142 4
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 10/09/2026
Get a tune up, learn new cycling skills and decorate your bike at the Sandhurst Circle Bike Festival! Kids and youth aged 4 to 18 are invited to the free community cycling drop-in event on September 13 from 1:30 to 4:30 p.m. at 121 Brimwood Boulevard. toronto.ca/sandhurstconnections
Children and youth riding bikes on a winding road at Sandhurst Circle Bike Festival with bike tune-up, safety skills, and decorating workshops.
022 2
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 08/09/2026
The Lower Don Trail and staircases providing access from Queen Street, Dundas Street and Riverdale Park Bridge are open. A temporary trail closure is planned for Fall 2026 to complete the connection to the Riverdale Pedestrian Bridge. Learn more at toronto.ca/lowerdon.
A person cycles using a Bike Share bike on the Lower Don Trail. Two people cycle on the Lower Don Trail surrounded by green trees and bushes under a partly cloudy sky.
291 9
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 04/09/2026
The first phase of construction in the Baycrest Park Improvements project is complete, with stairs and a ramp providing access to Yorkdale station from Baycrest Park. The second phase of construction is set to be completed in early 2027. Visit toronto.ca/baycrestpark for details.
Wide concrete pedestrian ramp with metal railings on both sides connects Baycrest Park to Yorkdale TTC station. Concrete stairs with metal railings lead down to a street underpass with a person walking away in the distance.
030 3
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 03/09/2026
The multi-use path in Garrison Common from The Bentway to Strachan Avenue Burial Grounds will be closed on September 5 and 6, from 2:30 to 10:30 p.m. (except for those using mobility aids). The stairs to Strachan Ave will remain open. Signage with route options will be posted.
032 3
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 26/08/2026
Road reconstruction has begun on Morningside Avenue from Highway 401 to Tams Road/Pan Am Drive, which includes a new sidewalk on the east side, a multi-use trail and raised cycle track on the west side, and other road safety improvements. Learn more at toronto.ca/morningsideconnections.
toronto.ca
Morningside Connections
The City of Toronto is planning to reconstruct the road on Morningside Avenue from Tams Road/Pan Am Drive to south of the Highway 401 eastbound off-ramp. This work will consist of reconstruction of the road, the curb and sidewalk to bring them to a state of good repair and to upgrade pedestrian and cycling infrastructure. […]
050 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 21/08/2026
Cycle tracks have been reinstated on Ordnance Street from Strachan Avenue to a point 100 m east. This Council-approved bikeway provides connections between City Place (via Fort York Boulevard), Garrison Common trails, Wellington Street West cycle tracks and Liberty Village.
Two people cycle on Ordnance Street, which features a cycle track protected with concrete curbs.
1255 25
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 19/08/2026
Cycle tracks were added on Martin Grove Road north and south of Burnhamthorpe Road, in addition to bike signals, new sidewalks and TTC platform upgrades. Shared lane markings were added south of Burnhamthorpe Road to Dundas Street West on several local streets. (2/2)
030 3
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 19/08/2026
The Martin Grove Road bikeway project has been installed between Burnhamthorpe Road and Dundas Street West, which provides connections from existing bikeways on Martin Grove Road to the Kipling GO/TTC Station. toronto.ca/martingrovebikeway (1/2)
1114 11
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 12/08/2026
Hello Arthur, thank you for your question. Unfortunately, there is insufficient road width west of Spadina Avenue to add physical separation to the existing painted bicycle lanes. The option to widen the road is not within our budget at this time.
010 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 12/08/2026
Traffic signals will be installed in late 2026/early 2027 at Oakwood Avenue/Holland Park Avenue and Vaughan Road/Wychwood Avenue, with more bikeway installations to follow. Visit toronto.ca/vaughanwychwood for more details. (2/2)
toronto.ca
020 2
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 12/08/2026
As part of the Oakwood Village Road Safety Improvements project, contra-flow bikeways have been added on sections of Earlsdale Avenue and Arlington Avenue. Sharrows were also added on Robina Avenue and sections of Holland Park Avenue, Hursting Avenue, and Maplewood Avenue. (1/2)
Cyclist wearing a helmet rides on a city street bike lane under a cloudy sky with buildings and parked cars nearby.
180 8
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 12/08/2026
Biking home from a Toronto Blue Jays game or concert at the Rogers Centre just got safer, thanks to a new westbound cycle track installed on Bremner Boulevard between Spadina Avenue and Navy Wharf Court! Visit toronto.ca/cycling to learn more about cycling in Toronto.
Cyclist wearing a yellow jacket rides in a separated bike lane on a city street with cars and pedestrians nearby.Cyclist wearing a blue shirt rides a bike in a protected urban bike lane separated from traffic by white posts.Cyclist riding in a protected bike lane separated from traffic by a concrete barrier in a busy urban street with tall buildings.
3417 41
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 07/08/2026
The City of Toronto installed the Portland Street two-way bikeway and road safety improvements this summer. Initial data collection reveals increased pedestrian and cycling volumes, and decreased motor vehicle volumes. Visit toronto.ca/portlanddanleckie to learn more.
toronto.ca
Portland-Dan Leckie Cycling Connections
Use this map to determine how to best navigate where you need to go. The City of Toronto has installed a cycling route along Portland Street – across the Puente De Luz pedestrian/cycling bridge – and down Dan Leckie Way. These changes are part of the City’s Cycling Network Plan to improve road safety and […]
0213 21
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 06/08/2026
The West Toronto Railpath between Ernest Avenue and Bloor Street West has reopened following realignment to accommodate the Bloor GO/UP Station Improvements Project. Perth Avenue to Dundas Street West will close for construction in 2026. Learn more at toronto.ca/westrailpath.
081 8
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 28/07/2026
The Etobicoke Creek Trail beneath the railway bridge will be closed for public safety on July 29 and 30, and August 7 and 10 while Metrolinx completes major rehabilitation work. Signage will be posted at each entrance. Learn more at metrolinx.com/lakeshorewest.
metrolinx.com
Lakeshore West Line GO Expansion
Information about the Lakeshore West Line GO Expansion
012 2
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 27/07/2026
Project Update: Due to ongoing coordination efforts, watermain replacement and road resurfacing on University Avenue from College Street to Armoury Street has been deferred until further notice. Please visit toronto.ca/universityqueenspark for further details.
toronto.ca
010 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 27/07/2026
Access the new western portion of Biidaasige Park by the multi-use trail on Cherry Street or the cycle tracks on Commissioners Street! A Bike Share station is also available on site. www.toronto.ca/explore-enjoy/parks-….
toronto.ca
Biidaasige Park
Biidaasige Park, pronounced “bee-daw-si-geh” and meaning “sunlight shining toward us” in Anishinaabemowin is located near near Cherry Street on Ookwemin Minising, meaning “place the of black cherry trees.” The park celebrates waterway restoration and reconciliation.
051 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 27/07/2026
Watermain replacement and road resurfacing on University Avenue from College Street to Armoury Street will occur from August to Spring 2027. During construction, the southbound cycle track will be modified to allow two-way cycling traffic. Learn more at toronto.ca/universityqueenspark.
toronto.ca
University Avenue & Queen’s Park Upgrades
Watermain replacement and road resurfacing on University Avenue between College Street and Armoury Street will begin in August 2026. Please see the Construction Notice for more details.   Sections of University Avenue and Queens Park Crescent East are scheduled for watermain replacement and road resurfacing/restoration between 2023 and 2027, including: University Avenue (west side) from College […]
130 3
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 22/07/2026
From late July to late August, TTC will conduct overnight work causing cycle track detours on sections of Yonge and Bloor streets. Some daytime work may also occur. Paid Duty Officers will be requested to help guide road users through diversions. Learn more: ttc.ca/blooryonge.
010 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 21/07/2026
The Lower Don Trail between the Belleville Underpass and Queen Street will reopen on August 1, 2026 (weather permitting), with a temporary closure planned in Fall 2026 to complete a pathway connection to the Riverdale Pedestrian Bridge. Learn more at toronto.ca/lowerdon.
toronto.ca
Lower Don River Trail Improvements
The Lower Don River Trail is undergoing improvements to upgrade accessibility, mitigate erosion and flooding from the Don River, resolve drainage issues and enhance overall trail connections.
1141 14
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 21/07/2026
Road safety improvements will be installed in Oakwood Village in July and August, which include contra-flow bike lanes, sharrows, and changes to on-street parking. More safety improvements will be installed in late 2026/early 2027. Learn more at toronto.ca/vaughanwychwood.
toronto.ca
Vaughan Road and Wychwood Avenue Safety Improvements
July 2026 Update: Installation is expected to take place from the week of July 27, 2026 to the week of August 10, 2026. Details on what to expect during installation are available in the notice. The City of Toronto has approved road safety upgrades and changes to pedestrian and motor vehicle operations on Vaughan Road, […]
281 8
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 17/07/2026
Shoreham Drive will be closed to vehicular traffic (including bicycles) from Murray Ross Parkway to The Pond Road between August 1 and 14 for the National Bank Open. This area will become a pedestrian-only zone, with signage and paid duty officers on site. (2/2)
000 0
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 17/07/2026
Cycle tracks on Shoreham Drive between Murray Ross Parkway and a point 150 m west will close for the National Bank Open for the following dates: eastbound July 20–August 17; westbound August 1–13. Signs will direct drivers to share the lane single file with people cycling. (1/2)
100 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 15/07/2026
Need to make minor bike repairs on the go? Visit a self-service bike repair stand at many TTC subway stations. Locate a repair stand location on the Toronto Cycling Map, which is available at libraries, community centres, and several bike shops. Download the PDF map from toronto.ca/cycling.
041 4
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 14/07/2026
Phase 1 of the East Don Trail is officially open! This new 3.3 km trail spans from east of Don Mills Road to Bermondsey Road, and features a steel pedestrian-cycling overpass bridge, a concrete tunnel, and new pedestrian bridges. trca.ca/conservation/infrastructure-projects/east-don-trail-project/
Two people cycle on a rust-colored metal pedestrian bridge with protective mesh overhead along the East Don Trail.Two cyclists ride on the paved East Don Trail surrounded by green trees and bushes near an overpass. A wooden fence borders the trail. A person cycles on a wooden bridge along the East Don Trail.
0202 20
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 02/07/2026
Starting July 6, the TTC will conduct overnight work for two nights from 10 p.m. to 5 a.m. at the intersection of Yonge and Bloor Streets. Traffic control staff will divert pedestrians, cyclists, and vehicles around the work sites. Visit ttc.ca/blooryonge for details.
001 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 26/06/2026
On June 25, Toronto City Council authorized the installation of road safety improvement projects on several streets, including Davisville Avenue, Elmhurst Drive, Islington Avenue, Horner Avenue, and Rowntree Road and Panorama Court. secure.toronto.ca/council/agenda-it…
050 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 26/06/2026
Please note that from 9 a.m. on Friday, June 26 to 7 a.m. on Monday, June 29, Wellesley Street East will be closed (including the bikeways) from Yonge to Jarvis Streets for Pride Toronto festivities. Use the Toronto Cycling Map to plan an alternate route. toronto.ca/cycling
011 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 22/06/2026
Permanent separation also enhances compliance among drivers parking and loading and decreases opportunity for conflicts between motorists and people cycling. Using more durable materials also results in an improved aesthetic while requiring less maintenance. (2/2)
0110 11
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 22/06/2026
Poured-in-place curbs have been added as separation between the bikeways on Peter Street and Blue Jays Way. These upgrades improve safety and experience for people cycling, and maintain roadway uses for transit, emergency services, deliveries, shopping and commuting. (1/2)
People cycle in a cycle track on Blue Jays Way that is separated from the roadway by concrete curbs.Cycle track on Blue Jays Way with concrete curbs, white arrows and bicycle symbols running alongside a busy city street with cars in traffic.
3413 41
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 08/06/2026
Build your cycling skills, get a free bike check and decorate your bike at the Sandhurst Circle Bike Festival on Sunday, June 14 (1:30 - 4:30 p.m.) at Brimwood Boulevard Junior Public School! Open to children and youth ages 4–18 of all skill levels. toronto.ca/sandhurst
010 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 05/06/2026
The public can arrange to speak at the meeting by contacting the IEC Administrator at 416-392-4666 or iec@toronto.ca by 4:30 p.m. on June 9. Email your comments to iec@toronto.ca or visit toronto.ca/legdocs/tmmis/have-your-say.htm for more ways to participate. (2/2)
toronto.ca
000 0
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 05/06/2026
The next Infrastructure and Environment Committee meeting is June 10 at 9:30 a.m. City staff will recommend several road safety improvements, including on Davisville Avenue, Elmhurst Drive and Islington Avenue. secure.toronto.ca/council/agenda-it… (1/2)
110 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 04/06/2026
Happy Bike to Work Day, Toronto! The 2026 Toronto Cycling Maps are now available for free at the 311 info desk at City Hall, and will be in community centres and libraries this month. Learn more about cycling events taking place during Bike Month at bikemonth.ca.
Group of cyclists riding through a city street on Bike to Work Day.Crowd gathered at Nathan Phillips Square with city skyscrapers in the background under a clear blue sky.
0246 24
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 26/05/2026
For approximately five weeks, the TTC will conduct overnight construction at the corner of Bloor St E. and Yonge St. from 10 p.m. to 5 a.m. on weeknights. Bike and vehicle lane diversions are expected. Paid Duty Officers will help guide cyclists and motorists. Learn more: bit.ly/4u64R3W
011 1
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 21/05/2026
Installation of the 1.6 km multi-use trail along the Finch Hydro Corridor from Birchmount Road to Pharmacy Avenue resumed in April after a pause for winter, and is expected to be complete by the end of June 2026. Learn more at toronto.ca/finchcorridortrail.
toronto.ca
Finch Corridor Trail - Birchmount Road to Pharmacy Avenue
The City of Toronto is planning to build a multi-use trail along the Finch Hydro Corridor from Birchmount Road to Pharmacy Avenue . This trail connection will run 1.6 km within the hydro corridor on the south side of McNicoll Avenue (see map tab). The trail will provide a safe route for cyclists, pedestrians and […]
062 6
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 19/05/2026
Mark your calendars! The Bike to Work Day group commute to Nathan Phillips Square will take place on Thursday, June 4. Learn more about this event and others during Bike Month at bikemonth.ca.
bikemonth.ca
Bike Month
Bike Month is an opportunity for people to try riding a bike for the first time, learn new skills, or simply have fun and connect with new people. It’s about taking the time to rekindle the youthful magic of exploring your neighbourhood by bike or sharing that joy with the next generation of bike riders. Bike Month is a celebration of cycling.
062 6
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 15/05/2026
From May 19 to December 2026, traffic on sections of Wellesley Street East from Jarvis Street to Parliament Street will be reduced to one WB lane during road work, watermain replacement and road safety upgrades. The EB lane and cycle track will be closed. toronto.ca/wellesleycon
toronto.ca
Wellesley Street East Construction
Starting May 19, traffic on Wellesley Street East will be reduced to one, shared westbound lane within the construction zones. See the Travel Impacts tab for full details. The City will begin construction on sections of Wellesley Street East in 2026. Work will take place between Jarvis Street and Sherbourne Street, and between Ontario Street […]
020 2
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 13/05/2026
The Toronto Island summer ferry schedule begins today! Bring your bicycle or e-bike (at the discretion of staff) on board the ferry to access the island's trails and car-free roads. Learn more at www.toronto.ca/explore-enjoy/toront….
People boarding the City ferry with bicycles on a sunny day at the dock.
052 5
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 11/05/2026
Please see more details about the southbound cycle track diversion on Yonge Street, just north of Bloor Street, on May 12 at www.ttc.ca/service-advi.... x.com/TTChelps/sta...
x.com
TTC Customer Service on X: "Attention cyclists: There will be a temporary bike lane detour on Tuesday, May 12, from 9:30 a.m. to 3:30 p.m., southbound on Yonge Street immediately north of Bloor Street due to TTC work. https://t.co/hgpbsyQsQk" / X
Attention cyclists: There will be a temporary bike lane detour on Tuesday, May 12, from 9:30 a.m. to 3:30 p.m., southbound on Yonge Street immediately north of Bloor Street due to TTC work. https://t.co/hgpbsyQsQk
141 4
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 07/05/2026
Transportation Services has many in-ground cycling counters across the City and continues to expand the permanent counting program. Access cycling data from several permanent bicycle counters throughout Toronto at open.toronto.ca/dataset/perm.... (2/2)
open.toronto.ca
Open Data Dataset - City of Toronto Open Data Portal
040 4
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 07/05/2026
A new bicycle counter display has been activated on Martin Goodman Trail at Rees Street! The counter is composed of two parts: in-ground loops that count people cycling on the east and west sides of the trail, and the public counter display. (1/2)
A person cycles past a yellow bicycle counter display promoting safe riding with cyclist counts and safety rules.A person cycles past a yellow bicycle counter display promoting safe riding with cyclist counts and safety rules.
2194 19
Toronto Cycling and Pedestrian Projects @cyclingpedestrian.cityof.toronto.ca · 05/05/2026
As part of road resurfacing on Peter Street and Blue Jays Way, bikeways are being upgraded to include poured concrete curbs as separation for people cycling. During construction, people cycling and driving should travel single file with caution. This work is expected to be complete by mid-May.