Sign in

ArlingtonInfrastructure

@arl-infra.bsky.social
644 followers 359 following 610 posts

Transportation, zoning, and accessibility advocacy. 'Potential is what people see when what's in front of them isn't good enough.' Not affiliated w/ Arl Co.

PostsRepliesMedia
Reposted by ArlingtonInfrastructure
Department of Environmental Services Arlington, Virginia @arlingtondes.bsky.social · 11h
Tomorrow, Oct. 6, 7pm at Kenmore MS: Open House to shape the future of Carlin Springs Road. Help identify ways to improve safety, accessibility and travel for everyone. Online feedback form is up too. buff.ly/JxkJDA5
Map showing the study corridor along Carlin Springs Road with a blue northern segment labeled N Carlin Springs Rd and an orange southern segment labeled S Carlin Springs Rd, arrows indicating north/south extents and a "Study Boundaries" label at Arlington Boulevard.
032
Reposted by ArlingtonInfrastructure
Metro @wmata.com · 30/09/2026
The countdown is over! ⏰ #WeekWithoutDriving starts TOMORROW, so now's a good time to make your plan if you haven’t already. Review these four key steps, map out your trip, and get ready to travel by transit, bike, or on foot. Let's see where a week of driving less can take us. 🚇🚶🚲✨
Checklist: pick 1 trip to make car-free, plan your payment method, download the Metro Pulse app, practice your route
0132
ArlingtonInfrastructure @arl-infra.bsky.social · 25/09/2026
Thank you for your service, flexposts 🫡
A photo of three flattened flexposts along Clarendon Blvd where new curbs are now being installed in the quoted post.
060
ArlingtonInfrastructure @arl-infra.bsky.social · 21/09/2026
A new baby bike lane on Langston Blvd from N Moore St to N Lynn St and improved striping along N Lynn St approaching Langston Blvd. This is next to the 1901 N Moore St Rosslyn RCA Site: www.arlingtonva.us/Government/P...
A bike lane with flex posts next to three lanes on Langston Blvd approaching N Lynn St.A painted green turn box so that bike riders can make a two stage left onto N Lynn St from Langston BlvdGreen stripes at the ramp to 66 on N Lynn St. The bike lane also briefly rises onto concrete at the pedestrian refuge area.Green pain along several driveway entrances on N Lynn St.
031
ArlingtonInfrastructure @arl-infra.bsky.social · 15/09/2026
The Theodore Roosevelt Bridge path is now closed (9/15). A new, 10-foot wide path is expected to open in September 2027. The Key Bridge and Arlington Memorial Bridge are the official detour routes for bikes/peds. Project info: trbridge.ddot.dc.gov
trbridge.ddot.dc.gov
Theodore Roosevelt Bridge Rehabilitation
The existing bridge is Structurally Deficient and Functionally Obsolete, this project is to extend the service life of the bridge and improve mobility for pedestrians/bicyclists.
160
ArlingtonInfrastructure @arl-infra.bsky.social · 13/09/2026
Reminder: several ART and Metrobus route changes take effect today (9/13) 🚏 ART 41, 42, 56: www.arlingtontransit.com/about/blog/w... Metrobus A58, A76: www.wmata.com/ride/alerts-... Metrobus A1X: www.wmata.com/ride/alerts-...
A map of Ballston, Virginia Square, and Clarendon showing bus detours.


Bus Route Detours and Stop Closures
Starting on September 13, 2026, ART, Metrobus and OmniRide routes that normally run on Wilson Boulevard in Virginia Square will redirect onto Fairfax Drive, and bus stops on Wilson Boulevard between North Monroe Street and 10th Street North will close. Additional stops will open on Fairfax Drive to serve the route detours.

These detours will be in place for the duration of the Wilson Boulevard Streetscape Improvements project, which is expected to be completed in late 2028.

Impacted Bus Routes
ART 41 Arlington Mill-Ballston-Court House
ART 42 - Ballston-Pentagon (Pentagon City)
ART 56 - Rosslyn-Madison Community Center
Metrobus A58 - Wilson Blvd.-Farragut Square
Metrobus A76 - Rosslyn-Ballston-Mark Center
OmniRide - 622/932/972A map of the A1X northbound route changes. Southbound will not be updated until the Clark-Bell realignment project is completed. 

Effective Sunday, September 13, the new transitway infrastructure along Crystal Dr and 12th St S in Arlington County will open. The following service adjustments will be made to accommodate the transitway opening: 

Northbound  

Buses will operate via Crystal Dr, 12th St S, and S Hayes St to the Pentagon City Metro Rail Station. Northbound buses will no longer serve the Crystal City Metro Rail Station along S Bell St.  
Southbound  

Buses will continue to operate from the Pentagon City Metro Rail Station via S Hayes St, Army Navy Dr, S Eads St, and 15th St S due to other ongoing projects within the Crystal City area. 
New Stops Serviced 

Crystal Dr at 15th St S (Stop ID #6001443) 
12th St S at Long Bridge Dr (Stop ID #6001444)
12th St S at S Elm St (Stop ID #6001446)
062
ArlingtonInfrastructure @arl-infra.bsky.social · 09/09/2026
Zoning jump scare at the Clarendon Metro entrance 😱 The 3033 Wilson Blvd site currently under construction here will deliver 312 homes in addition to ground floor retail. www.arlingtonva.us/Government/P...
Detached houses visible from the entrance of the Clarendon Metro station. Photo taken looking across the intersection of Wilson Blvd and N Highland St
070
ArlingtonInfrastructure @arl-infra.bsky.social · 07/09/2026
Heads up: the highlighted crossings currently have a constant DON'T WALK signal. There are also no beg buttons here. Not sure how long it's been like this since I usually try to avoid this intersection but I reported it. 📍 Fairfax Dr, 10th St N, N Kirkwood Rd, & N Jackson St intersection
An overhead map image with two crossings highlighted in red circles. This is the intersection of Fairfax Dr, 10th St N, N Kirkwood Rd, & N Jackson St between Virginia Square and Clarendon. It provides an important bike and ped connection.An orange hand is all you will see on the pedestrian signal heads.An image with the crosswalk and pedestrian signals highlighted showing one of the locations where there is no WALK phase. They all are stuck with the solid Don't Walk hand lit up.Another crosswalk with the pedestrian signal head circled showing where there is no WALK phase.
3114
Reposted by ArlingtonInfrastructure
Department of Environmental Services Arlington, Virginia @arlingtondes.bsky.social · 31/08/2026
Starting Sept. 13, ART, @wmata.com Metrobus, and OmniRide buses will detour from Wilson Blvd. onto Fairfax Dr., and some stops will close/relocate, for the duration of the Wilson Blvd. Streetscape project. Estimated completed in late 2028. www.arlingtonva.us/Government/P...
Map of detoured bus routes in Virginia Square.
022
ArlingtonInfrastructure @arl-infra.bsky.social · 27/08/2026
It has been ~10 months since the Army Navy Drive Complete Street project was completed and the two-way cycle track still requires using a pedestrian beg button at S Fern St. Pedestrian recall should be enabled here so that a walk signal is automatically triggered every cycle.
170
ArlingtonInfrastructure @arl-infra.bsky.social · 24/08/2026
It's been an awful couple of weeks for transportation safety and school starts next week 😟
140
Reposted by ArlingtonInfrastructure
WilsonBWilsonB @ignorantelle.bsky.social · 21/08/2026
👀 @alongthepike.com @arl-infra.bsky.social ooh la lah🫦 Frfr this is a nice ride 🚲
181
ArlingtonInfrastructure @arl-infra.bsky.social · 21/08/2026
Reminder for two feedback opportunities that are both open through 8/23: 🔮 Arlington's Transportation Future Draft Multimodal Transportation Plan 🔗 publicinput.com/j70754 👉 susmo.org/arlingtons-t... 🛣️ VDOT Virginia 2026 Roadway Safety Survey Questionnaire 🔗 publicinput.com/i31756
The Arlington County "Arlington's Transportation Future" logo. There are diamonds to the left of the text that show a bus, a pedestrian, a bicyclist, and a car driver.VDOT  Virginia 2026 Roadway Safety Survey Questionnaire header followed by text.

Virginia is updating its Strategic Highway Safety Plan (SHSP) – Arrive Alive. This plan sets the statewide direction for making Virginia’s roads safer for everyone—drivers and passengers, pedestrians, bicyclists, motorcyclists, and others.


The Steering Committee, which consists of the Virginia Department of Transportation (VDOT), Virginia State Police (VSP), Department of Motor Vehicles (DMV), Department of Health (VDH), and other state and local agencies and safety partners overseeing this effort, wants to hear from you. Please share your experiences and concerns about roadway safety. Your feedback will help shape the next SHSP and guide safety efforts in the coming years.


Taking this survey is completely optional. The survey contains 19 questions and will take approximately five minutes to complete. You do not need to answer every question before clicking "Submit Survey" at the end of the survey. Your responses are anonymous and confidential, and we will only report results as combined totals across the state.
032
Reposted by ArlingtonInfrastructure
Slacquer @slacquer.bsky.social · 19/08/2026
#arlingtonva www.youtube.com/watch?v=jZjR...
youtube.com
Residents raise concerns over crosswalk after woman hit and killed in Arlington| NBC4 Washington
YouTube video by NBC4 Washington
173
Reposted by ArlingtonInfrastructure
ARLnow @arlnow.bsky.social · 17/08/2026
UPDATE: The woman struck by a driver on S. Glebe Road last night has died, ACPD just announced www.arlnow.com/2026/08/16/b...
arlnow.com
UPDATED: Two pedestrians fatally struck by drivers Sunday night | ARLnow.com
Two pedestrians, a man and a woman, were killed in separate crashes on a stormy Sunday night. The first happened shortly after 8:30 p.m. at the intersection of Carlin Springs Road and Columbia Pike,…
053
ArlingtonInfrastructure @arl-infra.bsky.social · 12/08/2026
A new Vision Zero pilot project addresses turn conflicts at the intersection of Fort Myer Drive & Langston Blvd in Rosslyn following a fatal crash in April 2026. "People will be able to cross the street at all four crosswalks without vehicles attempting to turn through the crosswalk."
Photo of Info Flyer showing image of intersection:

VISIONZERO
ARLINGTON COUNTY
Safety Pilot Project: Westbound Langston Blvd & Ft Myer Dr
Description
This pilot project will modify the signal phases at Westbound Langston Blvd & Fort Myer Dr to remove potentially conflicting turning movements from the west and south crosswalks. The changes will include the westbound Langston Blvd left-turn movement being controlled by a turn arrow signal.
The intersection of Westbound Langston Blvd and Fort Myer Dr is located on Arlington's current High-Injury Network. The western crosswalk at this intersection connects multimodal traffic from both the Key Bridge and the Custis Trail to a two-way cycle track along Fort Myer Dr, providing a key regional multimodal connection. There is a PhotoRED red-light safety camera on southbound Fort Myer Dr at the intersection.
Objectives
The objective of the pilot is to reduce the potential for vehicle turning conflicts between people walking or biking across the west and south leg of the intersection.
Once the pilot is installed, there will be no potentially conflicting signal phases at the intersection.
Tracking and Monitoring
Once installed, the County will monitor safety impacts and may make changes based upon site conditions.
The County will evaluate driver and pedestrian interactions pre- and post-signal modifications, as well as queuing on Fort Myer Dr to the Key Bridge.
The pilot will remove potential conflicts for the west and south crosswalks.
People will be able to cross the street at all four crosswalks without vehicles attempting to turn through the crosswalk.
Pilot Timeline
Summer 2026: Install Pilot
Fall 2026:
Monitor Conditions & Collect Data
Winter/Spring 2027: Next Steps
Note: This pilot will require active monitoring. Conditions at the intersection may change, and the County may need to adjust and/or end the pilot based on site conditions. Langston Blvd is owned and maintained by the Virginia Dept. of Transportation (VDOT).
072
Reposted by ArlingtonInfrastructure
Sustainable Mobility for Arlington County @susmo.org · 05/08/2026
Set the stage for 30 years of transportation improvements in Arlington. Help us get the final details of Arlington's new transportation right! A comprehensive network for bikes & scooters, safe accommodations during construction, and more! susmo.org/arlingtons-t...
susmo.org
Nailing the Final Important Details of Arlington's Transportation Future
After years of work and several long rounds of public engagement, Arlington has a new draft transportation plan!  There is a lot to like in the draft, and our primary goal is to make sure it stays…
033
ArlingtonInfrastructure @arl-infra.bsky.social · 02/08/2026
Share your ideas and experiences for multimodal improvements in Rosslyn. Please help fix my neighborhood! 😅 Today (8/2) is the last day to complete this survey about Rosslyn transportation projects for N Lynn St, Fort Myer Dr, and Wilson Blvd. 🔗 publicinput.com/t04067
An overhead map of Rosslyn with highlights showing the two project areas covered by the survey. The first is N Lynn St Improvements from Fairfax Dr to Langston Blvd. The other is Fort Myer Dr from Langston Blvd to Fairfax Dr + Wilson Blvd from N Arlington Ridge Rd to N Oak St.
150
Reposted by ArlingtonInfrastructure
SRtwofourfour @srtwofourfour.bsky.social · 30/07/2026
Genuine for real actual big city protected bike lanes in #southarlington already in use! And look they R even getting the green treatment - we made it ma we finally made it!
Protected bike lane More bike lane More PBL Green bits
3241
ArlingtonInfrastructure @arl-infra.bsky.social · 28/07/2026
Rumble strips for bike lanes instead of traffic lanes 🙃 📍 Clarendon Blvd approaching N Troy St and N Scott St
3111
Reposted by ArlingtonInfrastructure
Friends of the Mount Vernon Trail @mountvernontrail.org · 27/07/2026
Exciting news! We have printed Mount Vernon Trail Maps 🗺️ They are not only practical, but also make cool wall art! In the coming months we will be distributing MVT maps to businesses and community spaces near the trail. If you would like printed maps for your business please reach out.
3247
ArlingtonInfrastructure @arl-infra.bsky.social · 27/07/2026
A fresh concrete sidewalk and replacement bus shelter at the 2425 Wilson Blvd site 🙌 The bus stop at Wilson Blvd & N Barton St (6000652) reopens today (7/27) and will serve the ART 41, 56, 77 + Metrobus A58 routes 🚏
A concrete sidewalk with a landscaping strip to the left with tree pits and streetlights. Location is along Wilson Blvd near the intersection with N Barton StA standard bus shelter with a bench and glass walls. There is a recycling and trash bin on either side.A notice next to the bus shelter stating that the stop will reopen 7/27.
1110
ArlingtonInfrastructure @arl-infra.bsky.social · 26/07/2026
The Mount Vernon Trail detour for the Long Bridge Project is really nice! Location is just north of Gravelly Point ✈️
1102
Reposted by ArlingtonInfrastructure
Theo in Arlington @adamtheo.com · 22/07/2026
Every arlingtonian should watch the final 15 minutes of tonight's Arlington board meeting, where @susanforarlington.bsky.social tries to insert a surprise agenda item to "study" the #MissingMiddle caps, presumably to extend/make permanent & the other CB members react appropriately.
youtube.com
Arlington County Board Recessed Meeting | July 21, 2026
YouTube video by Arlington County, VA
7125
ArlingtonInfrastructure @arl-infra.bsky.social · 17/07/2026
Your homework while avoiding the awful air quality outside is to review all 104 pages of the draft Multimodal Transportation Plan 🙃 Feedback will be collected through 8/23. www.arlingtonva.us/Government/P...
The cover of the Multimodal Transportation Plan document. There are images of various scenes around Arlington on the left side. Text is:

 Arlington Virginia

DRAFT Arlington

Multimodal Transportation Plan 

An element of Arlington County's Comprehensive Plan July 2026
150
Reposted by ArlingtonInfrastructure
Department of Environmental Services Arlington, Virginia @arlingtondes.bsky.social · 16/07/2026
TONIGHT, 7pm: Open house to shape the future of Rosslyn’s streets. Share ideas for improvements along Fort Myer Drive, Wilson Boulevard and Lynn Street. Bonus: You'll get to check out "The View," the 36th floor ballroom of the Hilton. buff.ly/x4rHfDp
map of Rosslyn areas set for transportation improvements
042
ArlingtonInfrastructure @arl-infra.bsky.social · 13/07/2026
12th St S is looking great 🤩 This is part of Phase 2 of the Crystal City Potomac Yard Transitway extension to Pentagon City. More info here: www.arlingtonva.us/Government/P...
Center-running red bus-only lanes on 12th St S. Take from a street corner with a crosswalk visible in the foreground.Center-running red bus lanes on 12th St S with the intersection at S Eads St in the background. There is a bus platform that is still under construction as well.Another photo of the red center-running bus lanes on 12th St S near the intersection with S Elm St. There is an island bus platform still under construction.
150
ArlingtonInfrastructure @arl-infra.bsky.social · 12/07/2026
Another decade of @wmata.com! 🎉🚇
Me holding a WMATA "Metro 40 Years of Service" Smart Trip card next to a 50 Years / America's 250 Smart Trip Card.
080
ArlingtonInfrastructure @arl-infra.bsky.social · 07/07/2026
It's nice to have the Rosslyn bus tunnel open again following a two-month construction project at Central Place Tower 🚍
The Rosslyn bus tunnel between N Moore St and N Lynn St. There is a single traffic lane that provides one-way access for buses getting on N Lynn St from the Rosslyn bus bays.
070
ArlingtonInfrastructure @arl-infra.bsky.social · 01/07/2026
Some development updates from this week: 🏗️ Red Lion Inn (1501 Arlington Blvd) construction continues www.arlingtonva.us/Government/P... 💣 Clarendon Square (3033 Wilson Blvd) demolition is well underway www.arlingtonva.us/Government/P...
Two tower cranes above the frame of a building under construction along Fairfax Drive in Rosslyn. High-rises are visible behind the construction.The concrete shell of an office building being demolished. Protective structures are in place to manage debris.
140
ArlingtonInfrastructure @arl-infra.bsky.social · 22/06/2026
Arlington Transit tote bag at the beach 🏖️🚍
An ART Arlington Transit tote bag with the sand and sea in the background.
060
Reposted by ArlingtonInfrastructure
Sustainable Mobility for Arlington County @susmo.org · 21/06/2026
🚨🚨LAST CHANCE🚨🚨 Today (Sun 6/21) is the last day to weigh in on the Arlington Boulevard Trail, George Mason Drive Trail, and better policies around trail lighting and connectivity. Act now! susmo.org/take-action/
susmo.org
Take Action for Sustainable Mobility in Arlington, VA
Take Action for a Better Arlington Somebody's got to do it!
032
Reposted by ArlingtonInfrastructure
ARLnow @arlnow.bsky.social · 18/06/2026
County Board rejects historic status at Melwood site, allowing affordable housing to proceed
arlnow.com
County Board rejects historic status at Melwood site, allowing affordable housing to proceed | ARLnow.com
After months of buildup, County Board members have rejected a request to provide historic status to portions of a site approved for an affordable housing project. In a 4-0 vote last night (Wednesday),...
094
ArlingtonInfrastructure @arl-infra.bsky.social · 16/06/2026
We can once again enjoy an unobstructed cycle track on Fort Myer Drive in Rosslyn 🙌
A two-way cycle track along N Ft Myer Dr in Rosslyn that no longer has signs plopped in the middle of it. A properly-oriented sign reminding drivers of state law to stop for pedestrians at crossings.Screenshot of text response from Arlington County staff on the Report-a-Problem site ( https://arlingtonva.qscend.com/311/request/add )

Thank you again for bringing this to our attention. We have had the signs removed from the cycle track. We are aware that they are now placed to convey that the vehicles must yield to bikes and pedestrians and we are working with the property managers along that block to explore appropriate messaging for all users.
1110
ArlingtonInfrastructure @arl-infra.bsky.social · 14/06/2026
👍
A United States Park Police RAM pickup truck straddling concrete curbs and blocking both a bike lane and travel lane. Location is Wilson Blvd just prior to the N Courthouse Rd intersection and across from The Wendy.
8214
Reposted by ArlingtonInfrastructure
SRtwofourfour @srtwofourfour.bsky.social · 12/06/2026
Next time #columbiapike gets redone - let’s make this sidewalk a smidge wider 🤣
Skinny sidewalk
8133
ArlingtonInfrastructure @arl-infra.bsky.social · 12/06/2026
This is now 13 months into what was originally scheduled to be an 8-month project by the property owner at 2425 Wilson Blvd. I have opened multiple tickets for MOT issues here during that time. Recently, the bike lane closure warning was removed despite the bike lane looking like this:
A bike lane with a chain link fence across it
281
ArlingtonInfrastructure @arl-infra.bsky.social · 11/06/2026
Hopefully the County Board will follow the County Manager's recommendation and reject this farcical historical designation bid. Melwood site info: www.arlingtonva.us/Government/P...
A multi-story brick building with red trim.A large tree in front of a brick school building.
111
Reposted by ArlingtonInfrastructure
Arlington County Police Department @arlingtonvapd.bsky.social · 08/06/2026
ACPD is investigating a fatal hit-and-run crash on Columbia Pike www.arlingtonva.us/About-Arling...
arlingtonva.us
Police Investigate Fatal Hit and Run Crash on Columbia Pike
The Arlington County Police Department is investigating a fatal hit-and-run crash that occurred during the early morning hours of June 8, 2026.
111
ArlingtonInfrastructure @arl-infra.bsky.social · 05/06/2026
This week's driver education refresher for no particular reason 😶
Context: An Arlington County Police Department officer struck a pedestrian while passing a stopped vehicle in the adjacent lane. Article: https://www.arlnow.com/2026/06/02/video-acpd-cruiser-strikes-pedestrian-in-shirlington/

Picture of text:

Code of Virginia

Title 46.2. Motor Vehicles

Subtitle III. Operation

Chapter 8. Regulation of Traffic

Article 16. Pedestrians

§ 46.2-924. Drivers to stop for pedestrians; installation of certain signs; penalties

A. The driver of any vehicle on a highway shall stop when any pedestrian crossing such highway is within the driver's lane or within an adjacent lane and approaching the driver's lane until such pedestrian has passed the lane in which the vehicle is stopped:

1. At any clearly marked crosswalk, whether at midblock or at the end of any block;

2. At any regular pedestrian crossing included in the prolongation of the lateral boundary lines of the adjacent sidewalk at the end of a block; or

3. At any intersection when the driver is approaching on a highway where the speed limit is not more than 35 miles per hour.

A violation of this section is a traffic infraction, except that a violation of this section that results in serious bodily injury, as defined in § 18.2-51.4, to or the death of a vulnerable road user, as defined in § 46.2-816.1, who is lawfully crossing a highway is a Class 1 misdemeanor.

B. When a vehicle is stopped pursuant to subsection A, the driver of any other vehicle approaching from an adjacent lane or from behind the stopped vehicle shall not overtake and pass such stopped vehicle.
3101
Reposted by ArlingtonInfrastructure
Sustainable Mobility for Arlington County @susmo.org · 03/06/2026
Imagine a new trail on George Mason Drive, connecting to the Arlington Boulevard Trail, Columbia Pike Bike Boulevards, W&OD Trail, Four Mile Run Trail, Wakefield High School, and more! Phase 1 is moving forward, but it needs your support! Weigh in today!
susmo.org
Support a Life-Changing Trail on George Mason Drive
One of the highest priorities that came out of Arlington's 2018 Bike Plan update was the need for more north-south connectivity, and George Mason Drive was identified as the best corridor for achieving that connectivity.  Out of that plan came the South George Mason Drive Multimodal Transportation Study, and out of that study came a fantastic project for building a trail along George Mason Drive from Arlington Boulevard to Columbia Pike.  This project is Phase 1 - future projects would continue the trail South along George Mason Drive to the County line! Arlington wants your feedback on the concept plan, and there is organized opposition (because parking, of course), so it's critically important that the County hears your support!  In addition to supporting the project, we have a few substantive comments on making the trail design safer and minimizing conflicts, so check out our suggested feedback below and weigh in now!
0144
ArlingtonInfrastructure @arl-infra.bsky.social · 02/06/2026
Reminder for this evening (6/2) 👇
020
ArlingtonInfrastructure @arl-infra.bsky.social · 21/05/2026
Just one small problem with this graphic 🤣 #ArlingtonVA
A graphic from the Trust for Public Land showing that Arlington County ranks 7th in the ParkScore index. However, the photo shows the James River with the city of Richmond in the background.
380
ArlingtonInfrastructure @arl-infra.bsky.social · 20/05/2026
I hope the victim can make a full recovery 😔. The driver has apparently been cited. #VisionZero N Quincy St context: 🚑 Corridor is part of the High Injury Network 🚸 20 MPH school zone 🚧 Quick-build project here in 2024 🚲 A driver was cited in similar 2024 crash at nearby intersection w/ 13th St N
A map of Arlington County showing the high injury network highlighted. Specifically, N Quincy St is a county-controlled corridor included.A map of the streets around Washington Liberty High School showing that this stretch of N Quincy St has a 20 MPH school zone beacon.Updates to the intersection at N Quincy St & 14th St N as part of repaving. Bus stops were consolidated, pedestrian crossing was enhanced, and bike lane markings were added. Most importantly, precious RPP spots were preserved...An ARLnow article screenshot from an article about a driver striking a student at N Quincy St & 13th St N.
150
Reposted by ArlingtonInfrastructure
Dave Statter @statter911.bsky.social · 18/05/2026
Car deliveries turn Arlington County's $11 million dollar "Complete Street" project into an unsafe, complete s#!& show almost every weekday. Watch the video below. All shot within an hour last Thursday. #arlingtonva @susanforarlington.bsky.social @maureencoffeyva.bsky.social youtu.be/uuA6G4T4_Lc
youtu.be
Wrong-way driving is the rule for car deliveries near the Pentagon
YouTube video by STATter911
4163
ArlingtonInfrastructure @arl-infra.bsky.social · 16/05/2026
Your weekend homework that is due tomorrow (5/17) ✍️ 1. NVTA Six-Year Program comments: thenovaauthority.org/funding/fund... 💵 Several Arlington projects are being considered for funding 2. Neighborhood Complete Streets feedback: publicinput.com/w81483 🚶 Four projects that improve/add sidewalks
A map of Falls Church, Arlington, and Alexandria that is annotated to show projects that are seeking funding.

List of Arlington County projects:

ARL-024
Arlington Memorial Trail
ARL-026
South George Mason Drive Multimodal Improvements
ARL-027
South George Mason Drive and South Four Mile Run Drive Intersection Improvements
ARL-028
North Glebe Rd at I-66 WB Off-Ramp Intersection Improvements
ARL-029
South Glebe Road and West Glebe Road Intersection Improvements
ARL-030
Court House Metro Station Access Improvements
ARL-031
Next Generation Bus Rider Info
ARL-032
Arlington Boulevard Trail
ARL-033
South Glebe Road and 7th Street South Intersection Improvements
ARL-034
North Glebe Road at Quincy Street / Henderson Road Intersection Improvements
ARL-035
Performance Parking Initiative Phases 2 and 3
ARL-036
Custis Trail Widening and ModernizationNeighborhood Complete Streets logo for Arlington County above the intro to the feedback from. Text is:

Welcome!
Thank you for your interest in the Neighborhood Complete Streets Program. We are interested in your feedback on five projects:
Capital Projects

    NCS Shirlington Road from S. Glebe Road to 22nd Street S. in the Green Valley neighborhood
    NCS N Van Buren Street from from 18th Street N to 19th Street N, in the Arlington-East Falls Church neighborhood
    NCS N Tuckahoe Street from 18th Street N. to 19th Street N., in the Arlington - East Falls Church neighborhood
    NCS 13th Street North from N. Quincy Street to N. Lincoln Street, in the Ballston-Virginia Square neighborhood

These projects were nominated by community members, evaluated according to objective, County-board reviewed criteria and recommended for design by the Neighborhood Complete Streets Commission.
These engagement opportunities are open until May 17. Your feedback will help refine concept designs, which will then be considered at a Funding Hearing of the Neighborhood Complete Streets Commission.
052
ArlingtonInfrastructure @arl-infra.bsky.social · 15/05/2026
Happy Bike to Work Day! 🚲
The Rosslyn pit stop at Gateway Park for Bike to Work Day. There is a grassy area with tents set up and high-rises to the right.My bike posing in Georgetown along the Potomac River. The Rosslyn skyline in Arlington County is in the background. Part of the Key Bridge and Roosevelt Island can be seen to the sides of the photo.
0101
ArlingtonInfrastructure @arl-infra.bsky.social · 12/05/2026
N Moore St was once again at a standstill during the morning rush today. Regularly having only the bus lane passable while buses from six different routes are making stops at the bus bays is not great 😔
N Moore St at the Rosslyn Metro looking towards Wilson Blvd. A police SUV is in the left lane while an ART Bus and Metrobus are shown in the right lane A map showing the bus bays along N Moore St in Rosslyn. 55, A76, A58, F62, 45, and 56 routes all stop here.
230
ArlingtonInfrastructure @arl-infra.bsky.social · 08/05/2026
Bike to Work Day is one week away! 🚲 Arlington pit stop locations include Rosslyn, Ballston, Crystal City, and Columbia Pike. Registration info here: www.biketoworkmetrodc.org
Bike to Work Day 2026 poster. There is a multicolor bike graphic on the bottom half of the image.

Text:

FREE EVENT

BIKETOWORKMETRODC.ORG

REGISTER FOR

FREE T-SHIRT* & BIKE RAFFLE

WORKING FROM HOME?

BIKE TO YOUR LOCAL PIT STOP & BACK HOME

FREE REFRESHMENTS & GIVEAWAYS

AT PARTICIPATING LOCATIONS, WHILE SUPPLIES LAST

COMMUTER CONNECTIONS.

WABA

ICF

GO Alex

ARCTERYX

N

NATIONAL LANDING

goDCgo

MIDI

VDOT

AASHIO

LAKES

Giant

capital Bikeshare

AL'S

VISIONZERO

BIKES VIENNA

ARLINGTON VIRGINIA

AMERICAN

BIKE TO WORK DAY 2026

FRIDAY, MAY 15

25TH ANNIVERSARY


Visit biketoworkmetrodc.org for pit stop locations and times. "T-shirts available at pit stops to first 18,000 registrants.

Pit stops in D.C., Maryland, and Virginia!

The Bike to Work Day event is a program of the Metropolitan Washington Council of Governments and is funded by DDOT, MDOT, VDOT, and USDOT

Register for free at

BIKETOWORKMETRODC.ORG

800.745.7433

#BTW02026

bike to work day

2026
031