Sign in

TWuG, The Original

@twug.bsky.social
293 followers 794 following 4.7K posts

I love LEGO I love SF&F I use colorful phraseology in real life, but not on social media I have no tolerance for MAGA or fascism (but I repeat myself) He/Him/His

PostsRepliesMedia
TWuG, The Original @twug.bsky.social · 14/10/2026
Souvenirs!
Two guitar picks/plectrum in white. One with Puddles the clowns face and the other with Jim "Kimo" West's signature.
000
TWuG, The Original @twug.bsky.social · 14/10/2026
Various photos from tonight's show.
100
TWuG, The Original @twug.bsky.social · 14/10/2026
Puddles!
Puddles seated on stage. The screen shows an animated version of him.
100
TWuG, The Original @twug.bsky.social · 14/10/2026
Pretty good seats for @alyankovic.bsky.social and @puddlespityparty.bsky.social!
View of a stage with instruments, etc and a large screen showing Weird Al terrorizing a city ala Godzilla.  The screen reads:

"Weird Al" Yankovic Bigger & Weirder 2026 Tour

Special Guest
Puddles Pity Party
110
TWuG, The Original @twug.bsky.social · 05/10/2026
Relocating the window well residents to the greater outdoors so they can find proper dens before it gets too cold.
The inside of a grey bucket, with 3 large toads and a small short tailed rodent. Mouse, shrew, vole?  Beats me.
020
TWuG, The Original @twug.bsky.social · 28/09/2026
Our cat, Oreo, who let us serve her for 20+ years, passed in the night. She came to us at 12 weeks and for the next 20 years rose and fell in the ranks of the various cats that shared our home. Sometimes she was the boss, sometimes... not. 1/2
A black and white cat standing on a rumpled bed.

Her name is Oreo and she has just turned 20 years old in this picture.
140
TWuG, The Original @twug.bsky.social · 13/09/2026
Even our beagle loves our cats.
Gus, a beagle, is curled on a sofa. Simon, a tabby cat, is curled against him with his head resting on Gus's neck.
0374
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 32 completed!
A barbell shaped cradle field displaying Amelia.The completed paddlewheel boat Amelia!
110
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 32. The final bag!
A selection of black pieces for building the display cradle.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 31 done.
Gangplank and flags and anchor added. The gangplank is down.Here the gangplank is up.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 31.
A large variety of pieces for adding to the bow and gangplank for boarding.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 30 done. Paddlewheel!
The red paddlewheel has been installed in the frame and the drive arms are connected.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 30. More paddlewheel bits.
White, red, black and grey bits for adding to the paddlewheel.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 29 done! Paddlewheel!
A red paddlewheel. A hexagon frame with 12 sets of paddles.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 29. Paddlewheel time!
Red parts and black connectors for building the paddlewheel.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 28 done.
The pilot house has been added over the crew quarters. It's a small square room with white trim.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 28.
A lot of plates and bricks for building the bridge, I think. Let's find out!
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 27 done.
The top deck has been added to the boat. All the top deck railing and bunting is in place.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 27.
White, dark blue and tan pieces for completing the railing and the decorative bunting.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 26 done.
Railing installed with decorative blocks every five pillars. The decorative blocks have gold bunting in place
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 26. Lots and lots of railing.
Lots of white rail posts, some brackets and bricks and gold half circles.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 25 complete. And the rigging went smoothly! Amaze amaze amaze!
The twin stacks, with crowns of thorns have been installed and the rigging has been rigged!

The rigging runs from the deck, up to the stack, back to the deck, runs to the mast at the other end of the deck where it goes up to the mast, back to the deck, crosses a short distance, runs back up to the mast... You get the idea.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 25. I'm going to hate this step. String for rigging. I hate working with string.
A lot of black for building the stacks. Plus, gray string for the rigging. I hate this step already.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 24 completed.
Masts for rigging have been added and the crew quarters have been enclosed, with doors in place. I question the design choice of a window in the bathroom door that looks directly in on the toilet!
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 24
Doors, wall bricks in white, and a variety of small pieces for railing and other bits.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 23 completed.
Crew quarters. Bunk beds in the room to the left and a bathroom with sink, shower, and toilet.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 23.
Still working with plenty of white, a small amount of black and brown. Some small decor pieces, too.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 22 completed.
A tan deck is beginning to take shape. It is white at the perimeter and there is a block if black bricks to the back. In the center, but closer to the stern, two rooms are laid out. A wheelhouse and Captain's quarters?
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 22. Lots of tiles. Plenty of white plates, too.
White plates, tan tiles, some black bricks, and a lot of decorative tiles.
120
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 21 complete.
The upper deck cabin is now in place. The dining area has fancy sconces and there are smaller lights on the outside to light the upper deck walkway. In the corridor to the bandstand area are a menu, a poster for the band and a landscape painting.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 21. Walls, windows and doors and stuff to build decor.
Tan for walls, brown tiles, a door in brown and windows in dark brown. A grab bag of other pieces for creating decor.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 20 complete. And I had the orientation incorrect in my head. The door leads to the lower deck, not the bandstand area.
Tables and chairs have been added to the upper deck and a set of stairs to the top deck are beginning to take shape.
The chairs use a cam piece as a fancy back and the tables are square, but use a clever inverted plate to allow panel pieces to create the drape of a tablecloth.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 20
Tan bricks, a lot of white pieces, and some brown. I'm not sure what these will build yet.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 19 complete.
The upper cabin comes together. The deck has a pattern of red, tan and dark brown. There is a door that will lead into the bandstand and it is bracketed by screened windows.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 19. We finally begin building the upper deck cabin.
Black, dark brown, brown, dark tan and a smattering of other colors. A mix of plates, bricks and tiles, as well as 2 windows and a door.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 18 complete
A balcony area above the stairway to the upper deck. It is white with tan handrails and has dark blue and white bunting.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 18
Mostly white pieces, with a small amount of tan and gray.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 17 complete
Added the arches to the upper level. They are white, capped in gray and have floral elements facing outward. There are 5 arches on each side of the boat and 1 at the front.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 17
Lots of white and gray. Plates, arches, bricks, leaves.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 16 completed.
Railings with white posts and tan handrails are added to the upper deck, as is the connection point for the gangplank.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 16
This one contains a lot of white posts and some tan tiles. I think we will be building railings for the upper deck.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 15 complete. The boat is now named: Amelia.
The bandstand area is now complete and added to the aft of the ship above the engine room.  I hope that floor is insulated or people may not be able to hear the music!

The nameplate is centered between 3 windows on each side of the boat and 3 windows are behind the stage and look out on the sternwheel.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 15.
Mostly darker tan bricks and some dark brown windows. And a nameplate! The boat's name is Amelia.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 14 done. But the bandstand isn't complete!
A rectangular area, with darker tan walls, a band stand area. It contains an upright bass, a drum kit, a microphone on a stand, and a saxophone. Two tables are also in this area, one with a decanter and champagne glass and the other with a dark green bottle and a mug.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 14. Musical instruments? A band? Festive!
Dark tan and brown make up the majority of the parts in this step.

A saxophone, an upright bass, and what may be cymbals indicate we will be building a bandstand area.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 13 done.
Added the posts, rails, and fenders to the lower deck. The posts and rails are in white and the fenders are in black and hang from the posts at dock level.
120
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 13. A lot of white. Some dark gray clips. Cat for scale.
A silver gray tabby cat double checks my work.  A lot of white plates, tiles, slopes and bars in this step. Dark gray plates with clips and a handful of black rings.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 12 complete. Walkway for deck 2 added.
The narrow second deck walkway, in brown, with white and dark blue.
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 12. A new color has entered the chat: dark blue!
Almost exclusively plates for building the second deck  a lot of white, grey, brown, and now, dark blue
100
TWuG, The Original @twug.bsky.social · 06/09/2026
Bag 11 done.
The stern SNOT bricks are now covered in a mixed pattern of tan, gray and white plates.

The top of the walls for the galley area are now covered in plates. Thus will allow upper levels to be easily removed to view the interiors.
100