PJM has extended a Maximum Generation Alert and Load Management Alert, originally issued for Oct. 13, to remain in effect through Oct. 14. This alert does not require any action from customers. bit.ly/4hSOlzX
021
PJM Interconnection @pjminterconnection.bsky.social · 14h
Forecast peak #electricity usage for Oct. 13 in #PJM region: 112,447 MW at 5 p.m. (Eastern); total scheduled capacity 121,396 MW (data as of 7 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 14h
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 12: 102,790 MW between 6 and 7 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 12/10/2026
PJM has issued a Max Gen Alert and Load Management Alert for Oct. 13 ahead of expected tight system conditions caused by unusually warm fall weather and planned equipment outages required for maintenance and construction. This alert does not require any action from customers. bit.ly/4euZ6Yi
021
PJM Interconnection @pjminterconnection.bsky.social · 12/10/2026
PJM and the PJM generation and transmission owners coordinated closely during two unseasonably warm September periods to reliably serve demand while managing tightening generation and transmission system constraints, PJM told the Operating Committee Thursday. bit.ly/3W58N9w
010
PJM Interconnection @pjminterconnection.bsky.social · 12/10/2026
Forecast peak #electricity usage for Oct. 12 in #PJM region: 103,329 MW at 6 p.m. (Eastern); total scheduled capacity 117,705 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 12/10/2026
Preliminary peaks for #PJM region #electricity use on: Oct. 9: 92,204 MW between 7-8 p.m. Oct. 10: 87,520 MW between 7-8 p.m. Oct. 11: 91,759 MW between 7-8 p.m. (All times Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 10/10/2026
PJM welcomed Department of Energy Deputy Secretary James Danly (top left) and staff to its Valley Forge campus for a thoughtful conversation on the supply and demand dynamics shaping the industry today and PJM’s solutions-oriented focus to addressing these challenges.
000
PJM Interconnection @pjminterconnection.bsky.social · 09/10/2026
PJM has issued a Capacity Advisory for Monday, Oct. 12, and Tuesday, Oct. 13, ahead of expected tight system conditions caused by relatively warm fall weather and equipment outages needed for maintenance and construction. Read more at PJM Inside Lines. bit.ly/4dwSdFA
010
PJM Interconnection @pjminterconnection.bsky.social · 09/10/2026
Forecast peak #electricity usage for Oct. 9 in #PJM region: 94,190 MW at 5 p.m. (Eastern); total scheduled capacity 112,832 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 09/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 8: 96,356 MW between 5 and 6 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 08/10/2026
PJM has accepted the first three projects in a new, temporary process designed to get large generation resources online quickly to address the urgent growth in demand for electricity. Read more at PJM Inside Lines. bit.ly/4e2H3Zj
000
PJM Interconnection @pjminterconnection.bsky.social · 08/10/2026
Forecast peak #electricity usage for Oct. 8 in #PJM region: 96,389 MW at 6 p.m. (Eastern); total scheduled capacity 110,143 MW (data as of 8 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 08/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 7: 95,693 MW between 7 and 8 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 07/10/2026
Forecast peak #electricity usage for Oct. 7 in #PJM region: 94,810 MW at 7 p.m. (Eastern); total scheduled capacity 107,332 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 07/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 6: 93,130 MW between 7 and 8 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 06/10/2026
Forecast peak #electricity usage for Oct. 6 in #PJM region: 91,986 MW at 7 p.m. (Eastern); total scheduled capacity 107,745 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 06/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 5: 94,233 MW between 5 and 6 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 05/10/2026
Forecast peak #electricity usage for Oct. 5 in #PJM region: 93,806 MW at 7 p.m. (Eastern); total scheduled capacity 108,517 MW (data as of 7 a.m.)
030
PJM Interconnection @pjminterconnection.bsky.social · 05/10/2026
Forecast peak #electricity usage for Oct. 5 in #PJM region: 93,806 MW at 7 p.m. (Eastern); total scheduled capacity 108,517 MW (data as of 7 a.m.)
030
PJM Interconnection @pjminterconnection.bsky.social · 05/10/2026
Preliminary peaks for #PJM region #electricity use on: Oct. 2: 109,026 MW between 4-5 p.m. Oct. 3: 87,520 MW between 7-8 p.m. Oct. 4: 90,420 MW between 7-8 p.m. (All times Eastern)
030
PJM Interconnection @pjminterconnection.bsky.social · 05/10/2026
Preliminary peaks for #PJM region #electricity use on: Oct. 2: 109,026 MW between 4-5 p.m. Oct. 3.: 87,520 MW between 7-8 p.m. Oct. 4: 90,420 MW between 7-8 p.m. (All times Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 02/10/2026
PJM has updated its Data Viewer tool to highlight commonly accessed information through a new default dashboard view. Read more at PJM Inside Lines. insidelines.pjm.com/pjm-introduces-…
010
PJM Interconnection @pjminterconnection.bsky.social · 02/10/2026
Forecast peak #electricity usage for Oct. 2 in #PJM region: 109,712 MW at 4 p.m. (Eastern); total scheduled capacity 134,820 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 02/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Oct. 1: 114,244 MW between 5 and 6 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 01/10/2026
The first phase of PJM’s new interconnection process started Sept. 28, with 617 projects capable of generating nearly 169 GW of electricity remaining in the study Cycle. Read more at PJM Inside Lines. bit.ly/4xTozSg
011
PJM Interconnection @pjminterconnection.bsky.social · 01/10/2026
Forecast peak #electricity usage for Oct. 1 in #PJM region: 117,383 MW at 5 p.m. (Eastern); total scheduled capacity 136,021 MW (data as of 6 a.m.)
010
PJM Interconnection @pjminterconnection.bsky.social · 01/10/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 30: 103,817 MW between 5 and 6 p.m. (Eastern)
010
PJM Interconnection @pjminterconnection.bsky.social · 30/09/2026
Forecast peak #electricity usage for Sept. 30 in #PJM region: 106,971 MW at 5 p.m. (Eastern); total scheduled capacity 130,193 MW (data as of 7 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 30/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 29: 100,705 MW between 7 and 8 p.m. (Eastern)
021
PJM Interconnection @pjminterconnection.bsky.social · 29/09/2026
PJM has begun its annual review of proposed Large Load adjustments to determine the impact to PJM’s 2027 Long-Term Load Forecast, using updated guidelines designed to better account for how likely proposed projects are to materialize. Read more at PJM Inside Lines. bit.ly/4hkN2eb
010
PJM Interconnection @pjminterconnection.bsky.social · 29/09/2026
Forecast peak #electricity usage for Sept. 29 in #PJM region: 100,923 MW at 6 p.m. (Eastern); total scheduled capacity 128,242 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 29/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 28: 97,673 MW between 7 and 8 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 28/09/2026
Forecast peak #electricity usage for Sept. 28 in #PJM region: 96,857 MW at 6 p.m. (Eastern); total scheduled capacity 123,338 MW (data as of 8 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 28/09/2026
Preliminary peaks for #PJM region #electricity use on: Sept. 25: 90,035 MW between 7-8 p.m. Sept. 26: 86,645 MW between 7-8 p.m. Sept. 27: 89,948 MW between 7-8 p.m. (All times Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 25/09/2026
Forecast peak #electricity usage for Sept. 25 in #PJM region: 92,145 MW at 7 p.m. (Eastern); total scheduled capacity 124,907 MW (data as of 5 a.m.)
030
PJM Interconnection @pjminterconnection.bsky.social · 25/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 24: 92,442 MW between 7 and 8 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 24/09/2026
PJM Interconnection announced today that its Members have elected Janet Dietrich to the PJM Board of Managers. insidelines.pjm.com/pjm-membership-…
001
PJM Interconnection @pjminterconnection.bsky.social · 24/09/2026
Forecast peak #electricity usage for Sept. 24 in #PJM region: 94,016 MW at 6 p.m. (Eastern); total scheduled capacity 120,854 MW (data as of 7 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 24/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 23: 93,721 MW between 7 and 8 p.m. (Eastern)
010
PJM Interconnection @pjminterconnection.bsky.social · 23/09/2026
Projected growth in electricity demand began a sharp climb starting in 2023. Read how PJM is planning for this growth in PJM’s Annual Report. services.pjm.com/annualreport2025/p…
110
PJM Interconnection @pjminterconnection.bsky.social · 23/09/2026
Forecast peak #electricity usage for Sept. 23 in #PJM region: 95,066 MW at 6 p.m. (Eastern); total scheduled capacity 122,736 MW (data as of 7 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 23/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 22: 95,254 MW between 7 and 8 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 22/09/2026
As electric transportation grows across the region, PJM is preparing for a future where vehicles are not only consumers of electricity but active participants in the energy system. Learn more at www.pjm.com/about-pjm/advanced-tech…
010
PJM Interconnection @pjminterconnection.bsky.social · 22/09/2026
Forecast peak #electricity usage for Sept. 22 in #PJM region: 97,041 MW at 6 p.m. (Eastern); total scheduled capacity 124,322 MW (data as of 8 a.m.)
130
PJM Interconnection @pjminterconnection.bsky.social · 22/09/2026
Preliminary hourly integrated peak for #PJM region #electricity use on Sept. 21: 101,690 MW between 5 and 6 p.m. (Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 21/09/2026
We're changing how decisions get made so we can move faster. Why? Today's challenges require faster, more responsive decision making. Learn more at bit.ly/3UkXYzr
000
PJM Interconnection @pjminterconnection.bsky.social · 21/09/2026
Forecast peak #electricity usage for Sept. 21 in #PJM region: 103,253 MW at 5 p.m. (Eastern); total scheduled capacity 128,405 MW (data as of 6 a.m.)
020
PJM Interconnection @pjminterconnection.bsky.social · 21/09/2026
Preliminary peaks for #PJM region #electricity use on: Sept. 18: 121,702 MW between 4-5 p.m. Sept. 19: 104,786 MW between 5-6 p.m. Sept. 20: 108,771 MW between 5-6 p.m. (All times Eastern)
020
PJM Interconnection @pjminterconnection.bsky.social · 18/09/2026
This week PJM staff assembled 1,000 snack bags for the Upper Merion Area Community Cupboard, which they will distribute to children in need in the area. Thank you to the PJM staff who participated and helped make the event a success by supporting the organization’s culture of caring.