Sign in

NASA Image and Video Library #1 Fan

@nasaimageandvideo.bsky.social
88 followers 229 following 42 posts

Bringing NASA’s best content to the Bluesky space community

PostsRepliesMedia
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 10/05/2025
Artemis III SLS Liquid Hydrogen Tank by Steven B. Seipel Teams at NASA MAF in New Orleans move a hydrogen tank for SLS into the factory’s final assembly area on 4-22. Having completed thermal protection system application, teams will continue outfitting the 130’ tank with systems for Artemis III.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 09/05/2025
Artemis II MRAP training by NASA/Kim Shiflett Teams trained with the mine-resistant ambush protected vehicles, or MRAPs, inside the launch pad terminus area, where the emergency egress baskets carrying the astronauts and flight crew will arrive following their safe exit from the mobile launcher.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 03/05/2025
Artemis II Interim Crygoenic Propulsion Stage stacking by Isaac Watson NASA’s EGS begin integrating the ICPS to the Artemis II Space Launch System on April 30, 2025, inside the VAB at KSC in Florida. The 4-story propulsion system, built by Boeing and ULA, is powered by an RL10 engine.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 27/04/2025
Artemis III SLS Liquid Oxygen Tank by Michael DeMocker The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft to the Moon.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 19/04/2025
Artemis II Interim Cryogenic Propulsion Stage move to the VAB by NASA/Cory S Huston Technicians fueled the SLS upper stage, ICPS, with hydrazine for its reaction control system at the MPPF and will now integrate the four-story propulsion system with SLS rocket elements atop mobile launcher 1
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 10/04/2025
RS-25 hot fire preparations by Danny Nowlin Teams at NASA’s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 07/04/2025
Artemis II SLS launch vehicle stage adapter stacking by NASA/Isaac Watson A crane lowers the LVSA onto the SLS core stage on April 3, 2025, in the VAB. During ascent, the LVSA provides structural support and protects avionics within the upper stage from extreme vibrations and acoustic conditions.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 06/04/2025
Gateway HALO packaging by Thales Alenia Space In Turin, Italy, technicians prepare Gateway’s HALO (Habitation and Logistics Outpost) for transport. The module’s primary structure will travel to Northrop Grumman’s facility in Gilbert, Arizona, for final outfitting ahead of its launch to lunar orbit.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 03/04/2025
Artemis II mission patch. Photo by NASA/Robert Markowitz “This patch designates the mission as “AII,” signifying not only the second major flight of the Artemis campaign, but also an endeavor of discovery that seeks to explore for all and by all.”
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 01/04/2025
Underway Recovery Test 12 by NASA/Bill Ingalls The teams spent the week practicing the procedures they will use to recover the astronauts after their more than 600,000 mile journey from Earth to the Moon and back on the first crewed mission under the Artemis campaign.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 29/03/2025
Gateway AEPS Thruster Testing by NASA/GRC/Jef Janis NASA GRC has received the first of three AEPS thrusters for the Gateway lunar space station. The thruster will undergo testing before integration with Gateway’s Power and Propulsion Element, launching with the HALO module ahead of Artemis IV.
040
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 29/03/2025
Artemis Underway Recovery Test 12 by NASA/Bill Ingalls The Crew Module Test Article (CMTA), a full scale mockup of the Orion spacecraft, is seen as it is deployed from USS Somerset during the Underway Recovery Test-12, off the coast of California, Friday, March 28, 2025.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 27/03/2025
Artemis II SLS Launch Vehicle Stage Adaptor by NASA/Frank Michaux The cone shaped LVSA connects the SLS Moon rocket to the upper stage, the interim cryogenic propulsion stage, and protects the rocket’s flight computers, avionics, and electrical devices during launch and ascent.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 25/03/2025
Artemis II SLS core stage lift for stacking by NASA/Frank Michaux The move from the facility’s transfer aisle into High Bay 3 allows technicians to integrate the 212-foot-tall core stage with the stacked solid rocket boosters onto mobile launcher 1.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 24/03/2025
Artemis II SLS core stage stacking by NASA/Frank Michaux Teams with NASA’s EGS and primary contractor Amentum integrate the SLS Moon rocket with the solid rocket boosters onto mobile launcher 1 inside High Bay 3 of the Vehicle Assembly Building at NASA’s KSC on Sunday, March 23, 2025.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 22/03/2025
Artemis II Orion fairing installation by NASA/Glenn Benson The fairings encapsulate the service module and protect the solar array wings, shielding them from the heat, wind, and acoustics of launch and ascent, as well as help redistribute the load between Orion and the massive thrust of SLS.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 21/03/2025
Artemis II Orion fairing installation by NASA/Glenn Benson The Artemis II Orion spacecraft following successful installation of three spacecraft adapter jettison fairings on Wednesday, March 19, 2025.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 21/03/2025
Artemis IV hardware in production by NASA/Michael DeMocker The forward skirt is one of five major elements that make up the 212-foot rocket stage. The core stage, along with its four RS-25 engines, produce more than two million pounds of thrust to help launch NASA’s Orion spacecraft to the Moon.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 19/03/2025
Artemis IV SLS forward skirt production by NASA/Michael DeMocker Teams in New Orleans lifting a forward skirt out of its vertical assembly center on Jan. 31, 2025. The forward skirt houses flight computers, cameras, and avionics.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 19/03/2025
Artemis I wet dress rehearsal SLS rollout by NASA/Ben Smegelsky NASA’s Artemis I Moon rocket – carried atop the crawler-transporter 2 – rolls out of the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida on June 6, 2022, beginning the 4.2-mile journey to Launch Complex 39B.
020
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 18/03/2025
Artemis II SLS booster segment by NASA/Frank Michaux Engineers and technicians with NASA’s Exploration Ground Systems Program transfer the right center center segment with the NASA worm insignia to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida on Tuesday, Jan. 14, 2025.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 18/03/2025
Orion Crew Modules for Artemis II, Artemis III, and Artemis IV by NASA/Marie Reed The Orion spacecraft for NASA’s crewed Artemis II (right), Artemis III (left), and Artemis IV (center) missions next to each other inside the Neil Armstrong Operations and Checkout Building on June 22, 2023.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 17/03/2025
Artemis II Core Stage Lift from HB2 to Transfer Aisle by NASA/Kim Shiflett The 212-foot core stage will undergo final checkouts before being lifted into the VAB’s High Bay 3 for integration alongside the completed stack of twin solid rocket booster segments.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 17/03/2025
Orion Test Article in the Neutral Buoyancy Lab by NASA/James Blair U.S. Navy divers, Air Force pararescuemen and Coast Guard rescue swimmers practice Orion recovery techniques at the Neutral Buoyancy Laboratory (NBL) at the agency’s Johnson Space Center in Houston.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 17/03/2025
NEO Surveyor Instrument Enclosure Inside Historic Chamber A by NASA Wrapped in silver thermal blanketing, the 12-foot-long (3.7-meter-long) angular structure was subjected to the frigid, airless conditions that the spacecraft will experience when in deep space.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 16/03/2025
Artemis II SLS core stage transfer by NASA EGS
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 15/03/2025
Artemis II Core Stage Lift from HB2 to Transfer Aisle by NASA/Kim Shiflett NASA Exploration Ground Systems uses massive cranes inside the VAB to lift the fully assembled SLS core stage vertically 225 feet above the ground from High Bay 2 to a horizontal position in the transfer aisle.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 15/03/2025
Artemis II SLS core stage stacking by NASA/Kim Shiflett The 212-foot core stage will undergo final checkouts before being lifted into the VAB’s High Bay 3 for integration alongside the completed stack of twin solid rocket booster segments.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 14/03/2025
Crawler-Transporter 2 and Mobile Launcher 1 by NASA/Kim Shiflett The mobile launcher is equipped with a number of lines, called umbilicals, which will connect to NASA's Space Launch System (SLS) and Orion. CT-2 has been upgraded to handle the weight of the mobile launcher with SLS and Orion atop.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 13/03/2025
Gateway Power and Propulsion Element by Maxar Space Systems Technicians carefully install a piece of equipment to house Gateway’s xenon fuel tanks, part of its advanced electric propulsion system. 2024-07-01.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 12/03/2025
Orion Environmental Test Article by NASA/Quentin Schwinn The Orion ETA is passed through the vacuum chamber on its way to get ready for two critical tests in preparation for the Artemis II flight. There will be a jettison test of the Docking Module and a jettison test of the Forward Bay Cover.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 12/03/2025
Mars Helicopter, Ingenuity, by JPL-Caltech In the octagonal black frame, the black-and-white navigation camera is the thick circle appearing between and just below the two larger lenses. The color camera is the circle that is inset from the edge of the fuselage, appearing below the octagonal frame.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 12/03/2025
SPHEREx by NASA/JPL-Caltech/BAE Systems Using a technique called spectroscopy to image the entire sky in 102 wavelengths of infrared light, SPHEREx will gather information about the composition of and distance to millions of galaxies and stars.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 12/03/2025
Artemis I Space Launch System by NASA/Cory Huston A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022.
030
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis II Astronauts visit their SLS core stage by NASA/Kim Shiflett The core stage has two giant propellant tanks that collectively hold more than 733,000 gallons of super cold liquid propellant to feed the stage’s four RS-25 engines.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis V core stage production by NASA/Evan Deroche NASA’s Michoud Assembly Facility move crew lifting a completed liquid hydrogen tank barrel off the Vertical Weld Center on Feb. 10.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis II Orion solar panel installation by NASA JSC The four solar array wings for the Artemis II Orion spacecraft are installed inside the Operations and Checkout Building at NASA's Kennedy Space Center in Florida on March 7, 2025.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis III Orion production progress by NASA/Rad Sinyak Technicians work on the Artemis III Orion crew module inside the Operations and Checkout Building at NASA's Kennedy Space Center in Florida on March 5, 2025.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis I ICPS stacking by NASA/Kim Shiflett. The ICPS is a liquid oxygen and liquid hydrogen-based system that will fire its RL 10 engine to give the Orion spacecraft the big in-space push needed to fly tens of thousands of miles beyond the Moon.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Gateway HALO module by Thales Alenia Space. Gateway’s HALO (Habitation and Logistics Outpost) in a cleanroom at Thales Alenia Space in Turin, Italy, 2024-11-21.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis II SLS core stage by NASA/Kim Shiflett Teams with NASA’s Exploration Ground Systems transport the agency’s 212-foot-tall SLS (Space Launch System) core stage into High Bay 2 at the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Wednesday, Dec. 11, 2024.
010
NASA Image and Video Library #1 Fan @nasaimageandvideo.bsky.social · 11/03/2025
Artemis II poster by NASA/Daniel O'Neal
020