Glenne Drover @glenne.bsky.social · 07/05/2025
A 12,000 cycles 25yr life grid battery. That must drop the overall LCOS (per MWh in and out) quite a bit? www.pv-magazine-australia.com/2025/05/07/c...
pv-magazine-australia.com
Canadian Solar’s storage unit launches 5 MWh battery
The battery unit of the Chinese PV manufacturer said its new large-scale battery has a lifecycle of more than 12,000 cycles. The system has a nominal capacity of 5 MWh and a roundtrip efficiency of up...
173
Glenne Drover @glenne.bsky.social · 02/05/2025
reneweconomy.com.au/not-for-prof...
reneweconomy.com.au
Not-for-profit secures federal funding for three new community batteries
Melbourne not-for-profit secures federal government funding to roll out three new community batteries in partnership with a renewables focused retailer.
072
Glenne Drover @glenne.bsky.social · 23/04/2025
"Sungrow manufactured 7.8GWh of BESS for Saudi project in 58 days" Wow.. www.energy-storage.news/sungrow-and-...
energy-storage.news
Sungrow and BYD progress huge BESS projects in Saudi Arabia and Chile
Sungrow and BYD have provided updates on their huge BESS projects in Saudi Arabia and Chile, which combined total nearly 16GWh of capacity.
051
Glenne Drover @glenne.bsky.social · 23/04/2025
This might speed up Australia's PV roll out a bit? www.pv-magazine-australia.com/2025/04/23/l...
pv-magazine-australia.com
Leapting robot completes install of 10,000 PV modules
An AI-driven solar module-mounting robot has wrapped up its first commercial installation project in the Australian market, deploying almost 10,000 modules in less than 10 weeks.
010
Glenne Drover @glenne.bsky.social · 23/04/2025
TIL a new word. Greenhushing. kpmg.com/us/en/media/...
kpmg.com
Greenwashing, greenhushing and greenwishing
Don’t fall victim to these ESG reporting traps
031
Glenne Drover @glenne.bsky.social · 16/04/2025
The NEM 1 year rolling average has hit 40.0% renewable energy. Sat at 39%+ for quite a while.
062
Glenne Drover @glenne.bsky.social · 04/04/2025
NEM 1 year AV still under 40% Renewables, at 39.8%. Been close to 40% for soooo long but a tough number to get past. Must be time to start a poll on the date it will reach 40%?
120
Glenne Drover @glenne.bsky.social · 22/02/2025
Nice to see the supply chains broadening. www.pv-magazine-india.com/2025/02/20/v...
pv-magazine-india.com
Vikram Solar expands PV module capacity to 4.5 GW
Vikram Solar has expanded its PV module production capacity to 4.5 GW with the addition of a 1 GW line at Falta facility in West Bengal.
000
Glenne Drover @glenne.bsky.social · 22/02/2025
A$460m sale for a completed 500MWh grid battery is a handy data point for those interested. www.pv-magazine-australia.com/2025/02/21/p...
pv-magazine-australia.com
Pacific Green sells South Australian battery park for $460 million
British cleantech solutions company Pacific Green has inked a $460 million agreement to sell its 250 MW / 500 MWh Limestone Coast North battery energy park development to clean energy investor Intera ...
210
Glenne Drover @glenne.bsky.social · 22/02/2025
CSIRO Grants of up to A$30k to go and do some battery research in USA for 1 to 3 months. www.csiro.au/battery-rese...
csiro.au
Australia-US Researcher Exchange Network
Electrify your research in the USA: apply for a grant to join the Australia-US Battery Researcher Exchange Network
000
Glenne Drover @glenne.bsky.social · 18/02/2025
A possible large play on VRFB, UK, Scotland manufacture, Canada tech. www.energy-storage.news/invinity-pic...
energy-storage.news
Invinity picks ‘ideal partner’ Frontier Power for LDES cap-and-floor scheme bids
Invinity Energy Systems and Frontier Power have partnered to deploy vanadium flow batteries under the UK Long Duration Energy Storage procurement process.
010
Glenne Drover @glenne.bsky.social · 17/02/2025
A$3.8Bn for 1GW of wind and 1.5GWh of storage. www.ecogeneration.com.au/breaking-maj...
ecogeneration.com.au
Breaking: Major wind farm secures lease agreement - Ecogeneration
New South Wales' Minns Government has signed a lease agreement with wind farm developer WestWind Energy, paving the way for the proposed Lake Victoria Wind Farm in south-west New South Wales.
020
Glenne Drover @glenne.bsky.social · 12/02/2025
NEM PHES operators increasing their market participation. Ref: AEMO QED Q4/2024 p39
020
Glenne Drover @glenne.bsky.social · 29/01/2025
Great PHES Australian review (part 1) by Lawrence Molloy. Looking fwd to part 2. Pumped Hydro in Australia -- State of Play 2025 www.linkedin.com/pulse/pumped...
linkedin.com
Pumped Hydro in Australia -- State of Play 2025
Discover the latest developments in pumped hydro energy storage across Australia, including key findings, project types, and challenges faced by developers.
031
Glenne Drover @glenne.bsky.social · 19/01/2025
33.84% efficiency PV cell. Still increasing the %. www.pv-magazine-australia.com/2025/01/07/j...
010
Glenne Drover @glenne.bsky.social · 18/01/2025
SGIO...?
000
Glenne Drover @glenne.bsky.social · 18/01/2025
I am awaiting the outcomes of the Vic gov & c4net Enhanced System Planning project. Then we will have a good idea of how much work is required by the DNSPs to augment their grid to meet our needs..
000
Glenne Drover @glenne.bsky.social · 18/01/2025
Indeed, it will have to identify a competitive advantage.
010
Glenne Drover @glenne.bsky.social · 18/01/2025
Australia has a lot of gas deposits so hopefully if this technology is viable we will have quite a few site options.
100
Glenne Drover @glenne.bsky.social · 18/01/2025
@nicknet.bsky.social our favourite subject. NREL suggests that PV by reducing load on distribution Transformers (Tx) might be extending Tx lifetimes. pv-magazine-usa.com/2025/01/07/h...
pv-magazine-usa.com
Half of distribution transformers are approaching end of life
Utilities buying distribution transformers face waiting times and higher prices, as do solar developers needing similar step-up transformers. Distributed solar can extend the useful life of distrib…
273
Glenne Drover @glenne.bsky.social · 18/01/2025
Gee May 2027 is still a lot of sleeps away... 😕 www.pv-magazine-australia.com/2025/01/09/v...
pv-magazine-australia.com
Virtual power plants can compete in the energy market from 2027: AEMC
The Australian Energy Market Commission has released a final determination to allow virtual power plants to compete directly with large-scale generators in the energy market, scheduled to begin in 202...
010
Glenne Drover @glenne.bsky.social · 18/01/2025
For one at least... reneweconomy.com.au/land-deal-si...
reneweconomy.com.au
100
Glenne Drover @glenne.bsky.social · 18/01/2025
It would certainly be good to have one of these very large 8hr compressed air storage systems built at scale to allow proper evaluation. www.energy-storage.news/doe-offers-u... More than A$2bn should ensure that!
energy-storage.news
US DOE offers US$1.76 billion loan to Hydrostor for A-CAES California project
The US DOE's LPO has made a conditional commitment for a loan to LDES developer and operator Hydrostor of up to US$1.76 billion.
100
Glenne Drover @glenne.bsky.social · 18/01/2025
US$6bn seems stunning cheap for 5GW of PV & 19GWh of storage. Definitely a project to watch. www.pv-magazine.com/2025/01/14/m...
pv-magazine.com
Masdar, EWEC announce 5 GW/19 GWh solar-plus-storage project in Abu Dhabi
Masdar and Emirates Water and Electricity Co. (EWEC) plan to build a $6 billion, 5 GW/19 GWh solar-plus-storage project in Abu Dhabi, with operations set to start by 2027.
000
Glenne Drover @glenne.bsky.social · 17/01/2025
2GW of PV with a 30yr performance guarantee. Big project. www.pv-magazine.com/2025/01/15/a...
pv-magazine.com
A closer look at Al Dhafra, Abu Dhabi’s 2 GW desert wonder
The 2 GW Al Dhafra solar park covers an area of 21.5 square km in the sandy outskirts of the suburb Dhafra near Abu Dhabi. <b>pv magazine</b> visited to get the lowdown on the plant’s specs and how it...
031
Glenne Drover @glenne.bsky.social · 16/01/2025
123V 248V...?
100
Glenne Drover @glenne.bsky.social · 16/01/2025
I hope those "PF" numbers are not power factor?
100
Glenne Drover @glenne.bsky.social · 12/01/2025
see other post from me, i was wrong, i missed the 40kWh where there was two numbers. thank you for poking the right answer back to me.
010
Glenne Drover @glenne.bsky.social · 11/01/2025
my error, apologies, i have downloaded and compared in 30min detail and over a few months there were 40kwh of imports recorded during 30min periods that also recorded an export. the diff' was so small i had missed it before. thanks for the link to the spec that confirms that this is correct.
120
Glenne Drover @glenne.bsky.social · 11/01/2025
ok, i have downloaded my smart meter data again and will check, i am wondering if it that my pv is so small (only 1500w) i just can't see it.
010
Glenne Drover @glenne.bsky.social · 11/01/2025
Hi @nicknet.bsky.social does the UK market have hedges like Australia's cap contracts (typically A$300/MWh) that limit the exposure of the Retailers when this happens? www.theguardian.com/business/202...
theguardian.com
Why have Britain’s energy costs soared and what does it mean for Labour?
Claims that power plants are gaming the system to charge huge sums to switch on in the UK’s cold weather
000
Glenne Drover @glenne.bsky.social · 11/01/2025
They do a public domain calculation and I suppose they were concerned they would be criticized if they then just rounded it down. Will be interesting to see if the state government accept the recommendation.
010
Glenne Drover @glenne.bsky.social · 10/01/2025
I suspect a handful of Retailers will offer much more than the minimum. My current retailer pays me double the current fit.
000
Glenne Drover @glenne.bsky.social · 10/01/2025
Hey @nicknet.bsky.social look at the proposed new Vic minimum fed in tariff starting 1 July. Dropping from 3.3c/kWh to 0.04c/kWh. @xiaowang1984.bsky.social
250
Glenne Drover @glenne.bsky.social · 10/01/2025
360GWh Snowy 2 A$12bn not so bad compared to this Chinese 40GWh PHES costing US$1.9bn. www.pv-magazine.com/2025/01/09/w...
pv-magazine.com
World’s largest pumped storage power plant fully operational in China
The plant features 12 reversible pump-turbine units, each with a capacity of 300 MW, including two variable-speed units, bringing the total installed capacity to 3.6 GW.
052
Glenne Drover @glenne.bsky.social · 10/01/2025
000
Glenne Drover @glenne.bsky.social · 10/01/2025
Gee, it gets confusing quick. I am not sure my friend could even tell you what 3 phase was.... I will try to get a meter/s download from them.
010
Glenne Drover @glenne.bsky.social · 10/01/2025
Correct, also the controlled load is night time.
000
Glenne Drover @glenne.bsky.social · 10/01/2025
Correct, at the moment they have two Meters. A 3 phase for house load and 3p PV, and a single phase for the controlled load HWS. Will move the HPHWS to a power circuit on the 3 phase meter.
010
Glenne Drover @glenne.bsky.social · 10/01/2025
Friend is lucky, www.solar.vic.gov.au only A$99 to swap a 3.6kw elec to a HPHWS.
solar.vic.gov.au
Welcome to the Solar Homes Program
Helping Victorians save on their energy bills, tackle climate change and build a cleaner, renewable future.
000
Glenne Drover @glenne.bsky.social · 10/01/2025
My 6yo 3.6kw HWS was using ~10kwh/d. So when my friend complained about power use I went straight for the controlled load number, and friends controlled load 1,060kwh/90days matched perfectly. Hopefully friends HPHWS will be installed soon.
100
Glenne Drover @glenne.bsky.social · 10/01/2025
Yes that sounds the same as my HPHWS, 1kwh/d when I am away and 3 to 4kwh/d when I am home.
000
Glenne Drover @glenne.bsky.social · 09/01/2025
Friend wondered why bill had not reduced massively with 10kw PV. I looked at bill. 90 days house 700kwh, 17yo storage night time controlled HWS 1,009kwh. Lol. Gave the solar Vic.gov.au link, that should be gone in a few weeks for HPHWS that will run in PV hours.
vic.gov.au
Find, connect, shape your Victorian Government
Access grants and services, find out what’s on in Victoria and have your say on government decisions.
220
Glenne Drover @glenne.bsky.social · 09/01/2025
In this instance my friend's 3 phase meter (Powercor) has only 2 registers. One is recording imports, and 1 is recording exports. I do not have the meter data download to see if gives extra data.
210
Glenne Drover @glenne.bsky.social · 09/01/2025
Yes but my meter can only record the sum of import-export, i.e. one number. My son meter can record separate import and export, i.e. two numbers, resulting in different bills for the same consumption pattern.
110
Glenne Drover @glenne.bsky.social · 09/01/2025
my son pays for 2kwh import = 80c, less 1kwh export 3.3c = total 76.7cents. i just pay for 1kWh import, 40cents...
000
Glenne Drover @glenne.bsky.social · 09/01/2025
in my son's house meter is recording both an import and an export in the same 30 min billing period. BUT at my house the Smart Meter is only recording the net flow for each 30min and billing based on that. so ex if both houses import 2kw in 1st 20min and export 1kW in last 10min, different bills! /2
300
Glenne Drover @glenne.bsky.social · 09/01/2025
just the billing by the Retailer i am trying to be sure off.
100
Glenne Drover @glenne.bsky.social · 09/01/2025
What does the Retailer see in the smart meter data if the house is using 4kW on each of only 2 phases, 0kw on the 3rd phase, and the PV is generating 2kw into each of the 3 phases? What is the bill for 30min of 40c import, 3.3c export..?
100
Glenne Drover @glenne.bsky.social · 09/01/2025
Gee that is sad....! Next question is for a 3 phase PV inverter into a 3 phase smart meter, but the house loads seem to only be spread across 2 of the 3 phases. /2
100