Sign in

auroraenergy.bsky.social

@auroraenergy.bsky.social
14 followers 3 following 1 posts
PostsRepliesMedia
auroraenergy.bsky.social @auroraenergy.bsky.social · 20/12/2024
This project required extensive excavation for the super-low profile (check out that rock pile!) and the weather has also been extremely helpful with testing out the drainage system – which we can confidently say is operating as designed. #aurorasolar #solarinstallation #groundmountsolar
The image shows a rainy, unfinished ground-mount solar installation with a large pile of rocks that is larger than the blue vehicle next to it.
000